My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:44:48 AM
Creation date
8/19/2009 9:44:46 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-224
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: Ten (10) copies of 70°lo PS&E. <br />5.2 Coordination Meetings <br />Contractor shall attend and prepare minutes of two (2) meetings with City staff. These <br />meetings are assumed to occur at the same time as meetings for the Downtown Area <br />Project. <br />5.3 Public Meetings <br />Contractor shall prepare presentation material and attend one special/public meetings. <br />Present Design Report and Schematic Design. The City shall provide public notification. <br />Presentation materials include graphic boards and power point presentation. Consultant <br />will prepare minutes of the meetings. These meetings are assumed to occur at the same <br />time as meetings for the Downtown Area Project. <br />5.4 Comment Response Report <br />Contractor shall meet with City, review draft response to 30% Submittal comments and <br />prepare letter report that will be a compilation of all agency comments with responses <br />cited immediately below each comment. City to update priorities for sizing project to <br />meet budgetary constraints. Issue report one week after meeting. <br />5.5 Permitting/Approvals Submittal <br />Project documents shall be submitted by Contractor to permitting and approving agencies <br />as well as all utility companies to continue coordination. <br />5.6 Design Management <br />Contractor shall provide overall project management and maintain effective <br />communications with the City project staff. With each monthly invoice, Contractor shall <br />provide a project status report that outlines work completed and budget expenditures, as <br />well as an updated project schedule. <br />Deliverables: Monthly Status Reports <br />6.0 CONSTRUCTION DOCUMENTS (100% Submittal) <br />6.1 100% Construction Documents <br />Prepare essentially complete plans, specifications, and estimate of probable construction <br />costs. Documents will be based on prior phase approved documents incorporating <br />comments from the City, all review agencies and public. The plans to be prepared during <br />this phase are revised versions of those listed under 4.1 above. <br />CSA-Winzler and Kelly Page ll of 28 <br />Davis St/East 14`~ St Lighting and Pedestrian Enhancements Project No. 962-83-062 <br />
The URL can be used to link to this page
Your browser does not support the video tag.