My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:44:48 AM
Creation date
8/19/2009 9:44:46 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-224
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />E-5 Street Lighting Vault Cover Details <br />E-6 Electrical single line diagram <br />E-7 Electrical Panel Boards <br />E-8 Electrical Panel Boards <br />E-9 Electrical Details <br />E-10 Electrical Details <br />L-1 Landscape Layout (1" = 20'H) E14th Intersections <br />L-2 Landscape Layout/Details (1" = 20'H) Ei4th Intersections <br />Deliverables: Ten (10) copies of 30% PS&E. <br />4.4 Coordination Meetings <br />Contractor shall attend and prepare minutes of three (3) meetings with Gity staff. These <br />meetings are assumed to occur at the same time as meetings for the Downtown Area <br />Project. Also Contractor shall coordinate with PG&E on service points, load calculations <br />and other design issues relating to lighting design. <br />4.5 Public Meetings <br />Contractor shall prepare presentation material and attend two special /public meetings. <br />Present Design Report and Schematic Design. The City shall provide public notification. <br />Presentation materials include graphic boards and power point presentation. Consultant <br />will prepare minutes of the meetings. These meetings are assumed to occur at the same <br />time as meetings for the Downtown Area Project. <br />4.6 Comment Response Report <br />Contractor shall meet with City, review draft response to Concept Design Report <br />comment and prepare letter report that will be a compilation of all agency comments with <br />responses cited immediately below each comment. City to provide initial priorities for <br />sizing project to meet City Budgetary constraints. Issue report one week after meeting. <br />4.7 Permitting/Approvals Submittal <br />Project documents shall be submitted by Contractor to permitting and approving agencies <br />as well as all utility companies to continue coordination. Documents shall be submitted <br />to Caltrans for review. <br />CSA-Winzler and Kelly <br />Davis St/East 14~` St Lighting and Pedestrian Enhancements <br />Page 9 of 28 <br />Project No. 962-83-062 <br />
The URL can be used to link to this page
Your browser does not support the video tag.