My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:01:55 PM
Creation date
8/20/2009 3:01:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2003
Retention
PERM
Document Relationships
Reso 2003-046
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.2 -Joint Comment Resolution Meeting <br />Contractor shall organize, attend and lead a joint comment resolution meeting with <br />Caltrans and the City to discuss conflicting comments and obtain clarifications for the <br />70% review comments. Contractor shall document the comment resolutions in the joint <br />comment resolution meeting minutes. The meeting minutes shall be distributed to the <br />City and Caltrans. <br />Task 5.3 - 70% Comment Incorporations <br />Contractor shall incorporate 70% review comments to Project plans, specifications and <br />cost estimate. <br />Task 5.4 -100% PS&E <br />Contractor shall update the 70% PS&E submittal towards the completion of the design. <br />Contractor shall prepare a complete set of plans, specifications and estimate for the 100% <br />PS&E. Project plans, specifications and cost estimate shall be in accordance with the <br />format stated in Tasks 4.4, 4.5, and 4.6. <br />Contractor shall provide the project plans outlined in Task 4.4 and the following: <br />• Temporary Traffic Signal <br />Landscaping Plan <br />• Irrigation Plan <br />Landscaping and Irrigation Details <br />Task 5.5 - In-house Quality Control <br />Contractor shall perform an independent quality control review of the project plans, <br />specifications and estimate. The review shall include work performed by other members <br />of the design team. Contractor shall incorporate comments produced from the <br />independent quality control review prior to the 100% PS&E Submittal as described under <br />Task 5.6. <br />Task 5.6 -100°1° PS&E Submittal <br />Contractor shall assemble the plans, specifications and estimate for City, Caltrans and <br />other required agency review. Contractor shall provide City with six (6) sets and Caltrans <br />a maximum of twenty (20) sets of the 100% PS&E submittal for review. <br />Task 5 Deliverables <br />• 100% Design Plans -specific plan listing is found under Task 5.4 <br />• 100% Design Specifications <br />• Construction Cost Estimate <br />• Updated Drainage Analysis <br />• PG&E and East Bay Mud (EBMUD) Service Utility Applications <br />• Joint Team Resolution Meeting Minutes <br />Contractual Services Agreement Design Services Page 10 °f 38 <br />Revised 5-02 Westgate Extension to Williams Street Project, Project No. 03-144-39-003, ACTIA Project No. l 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.