My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:01:55 PM
Creation date
8/20/2009 3:01:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2003
Retention
PERM
Document Relationships
Reso 2003-046
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4.5 - 70% Specifications <br />Contractor shall prepare Project specifications in concurrence with the Project design <br />plans. The specifications shall be prepared in City's standard format using MS Word and <br />in accordance with the Standard Specifications for Public Works Construction (The <br />Green Book) and supplemented with the Caltrans Standard Specifications (latest edition) <br />as required. The specifications shall address each design element and shall include <br />payment clauses. <br />Task 4.6 - 70% Quantities and Cost Estimate <br />Contractor shall perform quantity take-offs to establish material quantities complying <br />with the 70% design plans. Contractor shall prepare a preliminary construction cost <br />estimate based on the quantities. The construction cost estimate shall be broken down <br />into the bid items established in the Project specifications. <br />Task 4.7 - In-house Quality Control <br />Contractor shall perform an independent quality control review of the project plans, <br />specifications and estimate. The review shall include work performed by other members <br />of the design team. Contractor shall incorporate comments produced from the <br />independent quality control review prior to the 70% PS&E Submittal as described under <br />Task 4.8. <br />Task 4.8 - 70% PS&E Submittal <br />Contractor shall assemble the plans, specifications and estimate for City, Caltrans and <br />other required agency review. Contractor shall provide City with six sets and Caltrans a <br />maximum of twenty sets of the 70% PS&E submittal for review. <br />Task 4 Deliverables <br />• Updated Aerial Base Sheets with Surveyed Data <br />• 70% Design Plans -specific plan listing is found under Task 4.4 <br />• 70% Design Specifications <br />• Construction Cost Estimate <br />• Drainage Analysis <br />Task 5: 100% PS&E Submittal <br />Contractor shall prepare 100% Plans, Specifications and Estimate for the Project. The <br />100% project plans, specifications and cost estimate shall be complete and include all <br />elements of work. <br />Task 5.1- 70% Comment Review <br />Contractor shall compile and distribute 70% review comments to Project design team. <br />Contractor shall review comments and determine conflicts. Review conflicts and <br />clarifications will be summarized and presented to the City. <br />Contractual Services Agreement Design Services Page 9 of38 <br />Revised 5-02 Westgate Extension to Williams Street Project, Project No. 03-]44-39-003, ACTIA Project No. 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.