My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:01:55 PM
Creation date
8/20/2009 3:01:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2003
Retention
PERM
Document Relationships
Reso 2003-046
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3.5 - 30% Project Plans <br />Contractor shall prepare 30% design development plan sheets using City's current <br />standard details and format. Project plan sheets shall be prepared in accordance with the <br />City's drafting standards and will be supplemented with design required standard <br />symbols and abbreviations. Plans shall be in English units or in such units required by <br />Caltrans and in AutoCAD 2002 electronic format. <br />Contractor shall provide the following project plans for the Project: <br />• Title Sheet <br />Layout /Geometric Alignment Sheets <br />• Preliminary Profile Sheets or Grid Grade Sheets <br />Preliminary Drainage Plans <br />Task 3.6 - 30% Specifications <br />Contractor shall prepare an outline of the Project specifications in concurrence with the <br />Project design plans. <br />Task 3.7 - 30% Cost Estimate <br />Contractor shall identify major construction components of the 30% design plans. <br />Contractor shall prepare a preliminary construction cost estimate based on the identified <br />construction components. <br />Task 3.8 - 30% PS&E Submittal <br />Contractor shall assemble the plans, specifications outline and estimate for City review. <br />Contractor shall provide City with six sets of the 30% PS&E submittal for review. <br />Task 3 Deliverables <br />• Updated Aerial Base Sheets with Surveyed Data <br />• 30% Design Plans -specific plan listing is found under Task 3.5 <br />• 30% Specifications Outline <br />• Cost Estimate <br />• Drainage Analysis <br />Task 4: 70% PS&E Submittal <br />Contractor shall prepare 70% Plans, Specifications and Estimate for the Project. <br />Task 4.1 - 30% Comment Review <br />Contractor shall review 30% design comments. Contractor shall meet with the City to <br />discuss, clarify and obtain resolution of the 30% design comments. <br />Task X4.2 -Utility Coordination <br />Contractor shall collect and review existing utility mapping for the Project Area from the <br />City, utilities, and all other resources of such information. Verification of utility mapping <br />by potholing or other field survey is not included in this scope of services. Contractor <br />shall plot existing utilities within the Project limits on base maps. Contractor shall send <br />base maps showing the location of existing utilities to City and other utility owners as <br />necessary for review and confirmation. Contractor shall solicit from all utility owners <br />Contractual Services Agreement Design Services Page 7 of 38 <br />Revised 5-02 Westgate Extension to Williams Street Project, Project No. 03-144-39-003, ACTIA Project No. 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.