My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Korve Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Korve Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2009 3:00:42 PM
Creation date
8/21/2009 10:26:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/19/2002
Retention
PERM
Document Relationships
Reso 2002-023
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor will provide a preliminary quantity take-off using the Preliminary Design as the <br />basis. Pavement sections may be quantified in square feet at this stage. A preliminary cost <br />estimate for the project will be prepared based on the quantities. <br />No specifications will be prepared for this submittal. <br />City to Provide: <br />• Prior to beginning Task 3 City will prepare one non-conflicting set of City review <br />comments. City will also provide City standard contract documents (`Boilerplate") to the <br />Contractor. <br />Deliverables: <br />• Updated Project Schedule <br />• Full sized Thirty Percent (30°Io) Drawings submittal -Consistent with the Drawing List <br />• Preliminary Quantity Take-off and Cost Estimate No Caltrans type Quantity will be <br />provided. <br />Schedule: Tasks 1 & 2 <br />Preliminary Layout and Cost Estimate <br />TASKS 3, 4 & 5 PS&E <br />Task 3 70% Plans, Specifications and Estimates <br />3 weeks from receipt of `Notice to <br />Proceed' <br />Contractor will prepare 70°Io PS&E based on the review comments from the Preliminary Design <br />submittal. This phase is focused on finalizing geometry so that final specifications and estimates <br />can be prepared in the next phase. Supplemental surveys at conform locations will be performed. <br />Drainage, stage construction, utilities, signal modifications and traffic operations will be <br />incorporated into the plan set. <br />The Contractor will perform a photometric analysis, to be utilized in the street light design to <br />maintain roadway lighting levels. <br />Contractor will distribute the plans to other public agencies and public utilities for review and <br />permits. The Contractor will obtain the location of service points for street lighting, signals, and <br />other electrical items designed by the Contractor. The design of the service points and their <br />electrical feeds will be by others. <br />Contractor will independently incorporate review comments from non-City agencies and utility <br />companies into the plans. Prior to Contractor incorporating these comments into the plans, <br />Contractor will forward them to the City for resolution of conflicts between these comments and <br />City's direction to Contractor. If necessary, a coordination meeting will be held among all <br />parties to resolve the conflict. <br />Exhibit A Page 4 of 13 <br />STIP Marina Widening <br />
The URL can be used to link to this page
Your browser does not support the video tag.