My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Korve Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Korve Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2009 3:00:42 PM
Creation date
8/21/2009 10:26:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/19/2002
Retention
PERM
Document Relationships
Reso 2002-023
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For estimating purposes, eight non-City contacts are assumed. <br />Contractor will coordinate with Alameda Flood Control District (ACFCD) to obtain the district's <br />approval, including providing plans and calculations as required for approval. <br />City to Provide: <br />• Prior to beginning Task 4 City will prepare one non-conflicting set of City's review <br />comments of 70% submittal <br />Deliverables: <br />• Updated Project Schedule <br />• Photometric Analysis <br />• Seventy Percent (70%) complete full size plans consistent with Drawing List <br />• Specifications will be prepared using the Greenbook Standard latest edition, Caltrans <br />Standard Specifications, Sections 84, 85 and 86 and City Standard format. Specifications <br />will be prepared in Microsoft Word software consistent with City design standards <br />• Construction Cost Estimate using proposed bid items <br />Schedule: <br />70% Plans, Specifications and Cost Estimate 3 weeks from receipt of City's <br />Preliminary Layout review <br />comments <br />Task 4 100% Plans, Specifications and Estimates <br />The Contractor will prepare 100% PS&E based on the review comments from the 70% submittal. <br />Contractor will incorporate information from utility companies and coordinate drawings with <br />utility relocations. To expedite the schedule, the 100% submittal will be a formal submittal of <br />final drawings and specifications submitted when the overall design is complete. . <br />City to Provide: <br />• Prior to beginning Task 5 City will prepare one non-conflicting set of City's review <br />comments of 100% submittal <br />Deliverables: <br />• One Hundred (100%) PS&E. One (1) set of full-sized plans <br />• Complete Contract book including City standard contract documents (`Boilerplate") and <br />technical specifications will be prepared using the Greenbook standard, Caltrans Standard <br />Specifications, Sections 84, 85 and 86 and City standard format. <br />• Plan approvals from other agencies and serving utilities. Including but not limited to <br />Alameda County Flood Control District (storm drain) and Pacific Gas and Electric (street <br />lights) <br />Exhibit A Page 5 of 13 <br />STIP Marina Widening <br />
The URL can be used to link to this page
Your browser does not support the video tag.