My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Korve Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Korve Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2009 3:00:42 PM
Creation date
8/21/2009 10:26:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/19/2002
Retention
PERM
Document Relationships
Reso 2002-023
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construction Cost Estimate using proposed bid items <br />Schedule: <br />100% Plans, Specifications and Cost Estimate <br />Task 5 Final Plans, Specifications and Estimates <br />2 weeks from receipt of City's <br />70% review comments <br />The Contractor will prepare and submit for bidding the Final PS&E (Bid Set) based on the <br />review comments from the 100% submittal. The Final PS&E submittal is focused on <br />constructability, final construction details and final plans format. Contractor will distribute and <br />coordinate the plans with other public agencies for review and permits application. <br />Deliverables: <br />• Final PS&E, in biddable format. One (1) set of full-sized reproducible drawing set of <br />plans will be submitted to the City. <br />• Final Contract Book including City standard contract documents ("Boilerplate") and <br />Specifications, which will be prepared using the Greenbook standard, Caltrans Standard <br />Specifications, Sections 84, 85 and 86 <br />• Final Construction Cost Estimate <br />• After the bids are opened and the construction contract awarded, electronic files in <br />AutoCAD format of the bid set will be submitted to the City. <br />Schedule: <br />Final Plans, Specifications and Cost Estimate 1 week from receipt of City's <br />100% review comments. <br />TASK 6 SERVICES DURING BIDDING AND CONSTRUCTION <br />Task 6.1 Services During Bidding <br />The Contractor will assist during the bidding phase of the project by responding to technical <br />questions from the bidders concerning the Contractor's design. Contractor shall attend the pre- <br />bid meeting, answer questions during the bid period, and prepare addenda as required. Addenda <br />issued to correct design deficiencies or errors in the plans will be prepared at no cost to the City. <br />Assumptions: <br />• Bidders will submit their questions first to the City. The City will review the PS&E set to <br />determine if the bidders' questions can be answered before submitting the question to the <br />Contractor. <br />• Questions from bidders will be given to the Contractor by the City. Contractor will not <br />communicate directly with bidders. <br />Exhibit A Page 6 of 13 <br />STIP Marina Widening <br />
The URL can be used to link to this page
Your browser does not support the video tag.