Task 6.2 Construction Services <br />During the construction period, the Contractor will provide clarification to drawings and respond <br />to all requests for information (RFI), review all submittals listed in the specifications and visit the <br />construction site up to 3 times to observe the site and answer Contractor questions. The <br />Contractor will also prepare final record drawings in Autocad upon completion of construction <br />and acceptance of the project by the City. <br />Assumptions: <br />• The Construction Contractor will submit their questions first to the City. The City will <br />review the PS&E set to determine if the Construction Contractor's question can be <br />answered before submitting the question to the Contractor. Contractor shall respond to <br />RFI in writing within 3 business days. <br />• Contractor will review submittals within 5 business days of receipt. <br />• Questions from Construction Contractor will be given to the Contractor by the City. The <br />Contractor will not communicate directly with the Construction Contractors. <br />• The City will be responsible for on-site inspection during construction. The City will <br />provide a Resident Engineer for the project who will be responsible for the on-site <br />activities such as change orders, preparing requests for information, and other activities <br />normally associated with resident engineers. <br />• Review of submittals of work designed by others will be by others. <br />• Revision to the plans or specifications for inclusion in change orders is not included in <br />this scope unless the changes are determined to be errors and omissions. Revisions to <br />plans or specifications required due to errors or omissions will be performed at no cost to <br />the City. <br />Deliverables: <br />• Submittal reviews <br />• Written response to RFP s as required. <br />• Record Drawings in Autocad. <br />DRAWING LIST <br />The following drawings are anticipated: <br />Description No. of <br />Sheets <br />Estimated Prelim. <br />Design <br />Submitta <br />1 70% <br />PS&E <br />Submittal 100°Io <br />PS&E <br />Submittal Final <br />PS&E <br />Title Sheet 1 X X X X <br />Gen. Notes/Abbreviations 1 X X X <br />Typ. Sections/Construction <br />Details/City Standard Details 4 X X X X <br />Roadway cross-sections 4 X X X X <br />Traffic Control Plan 1 X X X <br />Exhibit A Page 7 of 13 <br />STIP Marina Widening <br />