Laserfiche WebLink
TASK 4: West Estudillo/Hays Street Entry: The Contractor shall develop conceptual plans <br />to improve the pedestrian entrance to the shopping center and mitigate the appearance of the <br />trash enclosure at the site. These improvements shall incorporate the lighting chosen in <br />Task 2 and shall include paving, landscaping and entry gateway details. The improvements <br />could also include street furniture and enhancements to the walls of the buildings along the <br />entry to improve the pedestrian environment. <br />TASK 5: Landscaping: The Contractor shall develop a conceptual landscaping plan for the <br />landscaped areas within the Downtown Project Area. The plan should include street trees <br />and ground cover and should mitigate the appearance of any trash enclosures in the parking <br />lots. This plan will include a redesign of the landscaping at the historic plaza area at the <br />corner of Davis and East 14`h Streets. Special emphasis should be placed on developing a <br />plan that is low maintenance yet provides color for most of the year. <br />TASK 6: Pedestrian Improvements/Furniture• The Contractor shall develop a <br />minimum of two furniture options for placement within the Downtown Project Area for <br />consideration by staff and the City Council. These options should complement the <br />shopping center and should have options for benches, trash cans and planters. A site plan <br />showing the exact location of the furniture will not be required, however some thought <br />should be given to where the furniture could go given the existing conditions constraints <br />map. Plans for hardscape treatments (i.e. pavers, tiles, stamped concrete) for selected areas <br />within the Downtown Project Area shall also be developed. <br />EXHIBIT A Page 2 of 3 <br />G;ADS~BETH~DTProject_2002\Landscape Lighting Pedestrian Imprvt CSA OS-20-02,doc <br />