My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0714
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:58:56 AM
Creation date
9/4/2009 12:06:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
7/14/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0908
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0908
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upcoming Construction <br />• Downtown Garage <br />o Paving at the Albertson's site will begin this summer <br />o Council call for bids on July 20, 2009 <br />o Looking at grant opportunities, which will delay the Garage call for bids <br />by six months due to the grant application process <br />o Staff currently working with Better Place, Inc. for garage enhancements to <br />provide charging stations for electric vehicles <br />• Bay Trail Slough Bridge <br />o Award issued to RGW Construction <br />o Ground breaking ceremony scheduled for July 17, 2009 <br />o Construction to begin in Fall 2009 <br />• Annual Street Sealing <br />o Bid opening set for July 23, 2009 <br />• East 14th Street Medians <br />o Design complete <br />o Existing medians will be modified or narrowed <br />o Council call for bids on July 20, 2009 <br />• Reroofing of City Buildings — Year 2 <br />o Portion of the Main Library, Fire Station 12, several buildings at Public <br />Works <br />o Bids received <br />• Walkway Improvements — Wicks Boulevard <br />o Bids received <br />• 2008-2009 Overlay Rehabilitation Project <br />o Bids received <br />• Washington / Estabrook Intersection Modification and Signal Replacement <br />o Bids received <br />• WPCP Co -Generation Design/Build <br />o Design complete <br />o Contract with D. W. Nicholson Construction <br />o Materials are being ordered <br />o Construction to begin in August 2009 <br />Discussion ensued regarding the Garage project. Mayor Santos strongly expressed his <br />desire to have the bond money for the Garage returned to the bond holder. Steve <br />Hollister indicated that part of the bond money can be held for other projects. Uche <br />Udemenzue added that the majority of the grant or stimulus fund will be applied to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.