My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2009 1221
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 1221
>
10A Action 2009 1221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2009 10:05:24 AM
Creation date
12/17/2009 10:05:16 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/21/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 1221
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 1221
10A Action 2009 1221 Supplement
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 1221
Reso 2009-169
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 21, 2009 <br />Section 6: Municipal Operations <br />^ Complete retrofits of all traffic signals, pedestrian walk signs, and streetlights with <br />LED lights. The City of San Leandro has already installed red and green LED traffic <br />signals. LED or inductive lamps are significantly more energy efficient than conventional <br />lamps and save on maintenance costs due to their longer lifetimes. Assess and leverage <br />utility incentives for energy-efficient traffic and pedestrian signals and streetlights. <br />^ Complete recommended retrofits from ABAG/PGS~E study. Conduct energy efficiency <br />retrofits in the buildings prioritized by ABAG Energy Watch Partnership, Fire Stations 9, 10, <br />and 11, and evaluate HVAC efficiency and conservation opportunities. Other retrofits <br />recommended by the ABAG/PG&E study have already been completed. <br />^ Water Pollution Control Plant (WPCP). Continue to evaluate opportunities to purchase <br />high efficiency equipment. <br />^ Conduct feasibility study of solar PV installations on City property including the <br />WPCP. Solar photovoltaic (PV) panels displace conventional electricity. The City would <br />need to start with a solar feasibility analysis for installations on city facilities. A solar power <br />purchasing agreement (PPA) could help to minimize first costs. One potential site already <br />identified is at the Water Pollution Control Plant. <br />^ Install solar water heating at San Leandro indoor pools (Boy's and Girl's Club). <br />Thermal solar energy reduces energy needs for heating water. These upgrades can be <br />subsidized by state and PG&E rebates. <br />6.2 Goal: Reduce emissions related to City fleet operations <br />City fleet operations comprise almost 50 percent of the City's emissions inventory, and <br />represents one of the most difficult emissions sources to address. The City fleet encompasses <br />necessary vehicles ranging from police cars to maintenance trucks to forklifts that all serve <br />important jobs to keep the community safe, clean and attractive. <br />In 2008, the City purchased its first hybrid vehicle, a Chevy Malibu replacing a 1995 Chevy <br />Lumina. The hybrid's fuel efficiency, 30 mpg, compared to the Lumina's, 21.5 mpg, yielded a <br />savings of 172 gallons of gasoline, $705 in gasoline costs and 2 tons of CO2 annually. <br />Since the 2005 inventory of its emissions, the City has also undertaken measures to reduce its <br />emissions on the Public Works' heavy fleet vehicles. In order to comply with the California Air <br />Resources Board's Particulate Matter Retrofit Program, the City retrofitted fleet vehicles with <br />diesel particulate filters. All of the retrofit devices installed on City vehicles were "level 3" PM-10 <br />Page 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.