My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2010 0301
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0301
>
8G Consent 2010 0301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2010 10:12:24 AM
Creation date
2/25/2010 10:12:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/1/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0301
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0301
Reso 2010-025
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: March 1, 2010 <br />TO: Stephen L. Hollister, City <br />FROM: Uchenna Udemezue, Direct <br />Engineering and Transportati n Department <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Stephen L. Hollister <br />City Manager <br />BY: Kenneth Joseph, City Engi er <br />Engineering and Transport tion Department <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION APPROVING THE APPROPRIATION OF PARK DEVELOPMENT FUNDS <br />FOR FIXTURES, FURNISHINGS, AND EQUIPMENT (FF&E) RELATED TO THE SENIOR <br />CENTER PHASE 2 IMPROVEMENTS, PROJECT NO. 06-210-18-116. <br />SUMMARY AND RECOMMENDATION <br />Staff recommends appropriation of $300,000 from the Park Development Fund for the <br />installation of fixtures, furnishings and equipment (FF&E) for the subject project. <br />BACKGROUND <br />The Senior Center project consists of a 21,000 square foot building, which will support both <br />existing and future senior citizen programs, including but not limited to programs managed and <br />run by the City's Recreation and Human Services Department. <br />The building's structural systems, storage areas, stand-by power generator, and telephone/data <br />network have been enhanced to permit the facility to serve as the City's Emergency Operations <br />Center (EOC). The design included "green" building principles and is expected to receive <br />Leadership in Energy and Environmental Design (L.E.E.D.) Certification by the U.S. Green <br />Building Council. <br />In June 2008, the City awarded the contract for building construction of Phase 2 improvements <br />to Alten Construction, Inc., which is scheduled for completion in Summer 2010. <br />Analysis <br />The FF&E for the Senior Center is not included in the current building construction contract. <br />FF&E will need to be acquired and installed prior to opening the facility for public use or as an <br />EOC, and includes various items, such as: <br />
The URL can be used to link to this page
Your browser does not support the video tag.