Laserfiche WebLink
6. The new Medical Center campus would be developed in phases. The proposed phasing <br />would ensure that the medical center could continue to provide uninterrupted medical <br />service during implementation of the project. <br />7. Phase 1 of the San Leandro Kaiser Medical Center would include an approximately <br />436,000 square foot, 6 -story hospital building containing up to 264 licensed beds, located <br />generally in the central portion of the medical center site; an approximately 275,000 <br />square foot Hospital Support Building located immediately adjacent to and connected to <br />the hospital; a Central Utility Plant (CUP) contained within a 31,000 square foot, 2 -story <br />building located apart from the hospital and HSB, closer to I-880; and up to 2,100 surface <br />parking spaces. <br />8. Buildout of the Medical Center is defined as additional future development capacity to <br />enable Kaiser to incorporate new health care delivery technologies as well as additional <br />space for nursing, diagnostic, treatment, medical specialty and commercial/retail use. As <br />currently envisioned, buildout of the Medical Center may include expansion of the <br />hospital by an additional 175,000 square feet; the construction of two additional medical <br />office buildings of approximately 100,000 square feet each; and the potential for a <br />structured parking garage. This potential buildout would not occur until after completion <br />of Phase 1, but is anticipated prior to year 2030. <br />9. The Mixed -Use Retail development site includes several options, each of which are <br />anchored by a large retail component. These options include 432,000 square feet of retail <br />use only, or 387,000 square feet of retail use and 250 units of residential apartments, or <br />387,000 square feet of retail use and a 210 -room hotel. It is envisioned that the mixed-use <br />retail development will be implemented between 2013 and 2019, but these estimated <br />dates are dependent upon the economics of the retail industry and thus subject to change. <br />III. ENVIRONMENTAL REVIEW OF THE PROJECT <br />10. Pursuant to CEQA and the CEQA Guidelines, the City determined that an EIR would be <br />required for the Project. On August 11, 2008 the City issued a Notice of Preparation for <br />the EIR and an Initial Study, which was circulated to responsible agencies and interested <br />groups and individuals for review and comment. A copy of this Notice and the <br />comments thereon are included in Appendix A of the Draft EIR. <br />11. A Draft EIR was prepared for the Project to analyze its environmental impacts. The <br />Draft EIR was properly circulated for a 45 -day public review period from January 25, <br />2010 to March 10, 2010, consistent with the legally required comment period. The <br />Planning Commission held hearings on the Draft EIR on February 18, 2010. <br />12. The City received written and oral comments on the Draft EIR. The City prepared <br />responses to comments on environmental issues and made changes to the Draft EIR. The <br />responses to comments, changes to the Draft EIR and additional information were <br />published in a Final EIR on April 12, 2010. The Draft EIR, the Final EIR and all <br />appendices thereto constitute the "EIR" referenced in these findings. <br />-2- <br />