Laserfiche WebLink
Environmental Impact <br />EXHIBIT "D" <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />FOR THE KAISER SAN LEANDRO MEDICAL CENTER / MIXED-USE RETAIL DEVELOPMENT PROJECT <br />Mitigation Measures <br />Monitoring Responsibility Implementation and <br />Monitoring Timeline <br />• Post and maintain current information on recycling within the proposed buildings. <br />The information may cover cell phone recycling, household battery and household <br />hazardous waste recycling, and recycling (composting) of organic waste. <br />• Provide adequate area in building design to accommodate receptacles. <br />CC -1.7 Incorporate Water Efficient Fixtures and Appliances <br />San Leandro Building and Safety Prior to issuance of building <br />Services Division permits <br />Water -efficient fixtures and appliances shall be incorporated at a minimum 50 <br />percent compliance by the Kaiser Medical Center and in all of the Mixed -Use Retail <br />Development. <br />CC -1.8 Incorporate Energy Efficient Measures beyond Title 24 <br />San Leandro Building and Safety <br />Services Division <br />The Mixed -Use Retail Development and the Hospital Support Building at the Kaiser <br />Prior to issuance of building <br />Medical Center shall achieve a minimum of a 15 percent beyond Title 24 reduction <br />permits <br />in energy usage. <br />CC -1.9 Incorporate Energy Efficient Lighting. <br />San Leandro Building and Safety <br />Services Division <br />The project applicants shall require future building owners and tenants to use <br />Prior to issuance of building <br />energy efficient lighting, to the extent feasible and appropriate. At the minimum, all <br />permits <br />non -hospital buildings shall achieve a 15 percent reduction in energy use associated <br />with lighting over existing Title 24 standards. <br />San Leandro Building and Safety <br />CC -1.10 Incorporate Passive Solar Features into Project Design <br />Services Division <br />Prior to issuance of building <br />The project applicants shall incorporate passive solar design features into the <br />permits <br />buildings, which may include roof overhangs or canopies that block summer shade, <br />but that allow winter sun, from penetrating south facing windows. <br />San Leandro Building and Safety <br />CC -1. 11 Use Ener gv Efficient Roofing Materials. <br />Services Division <br />Prior to issuance of building <br />All roofing materials used in commercial/retail buildings at the Mixed -Use Retail <br />permits <br />Development shall be Energy Star® certified. All roof products shall also be certified <br />to meet American Society for Testing and Materials (ASTM) high emissivity <br />requirements. <br />CC -1.12 Incorporate Trees and Vegetation into Project Design <br />San Leandro Building and Safety <br />Services Division <br />Trees and other shade structures shall be incorporated into the Mixed- Use Retail <br />Prior to issuance of building <br />permits <br />Development to maximize summer shade and to minimize winter shade. Canopy <br />cover shall extend over 50 percent of non -permeable surfaces following a ten-year <br />growth period. <br />April 22, 2010 Kaiser Permanente San Leandro Medical Center and Mixed -Use Retail Development Project 21/22 <br />