My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2010195830
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2010
>
Inst 2010195830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2010 11:41:26 AM
Creation date
6/28/2010 2:59:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2010
Recorded Document Type
Development Agreement
Retention
PERM
Document Relationships
Ord 2010-007
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MONITORING AND REPORTING PROGRAM <br />FOR THE KAISER SAN LEANDRO MEDICAL CENTER /MIXED-USE RETAIL DEVELOPMENT PROJECT <br />Monitoring Responsibility Implementation and <br />Environmental Impact Mitigation Measures Monitoring Timeline <br />Extension conditions, the project would alternative modes of transportation. This would help to reduce trips along I-880. <br />cause an increase in the amount of <br />vehicle traffic on I-880 of more than one Implementation of Mitigation Measure TR-9.6 (modify the cycle length at the Marina <br />percent of the freeway segment's design Boulevard/I-880 Southbound Ramps intersection and add an additional lane along <br />capacity and also result in queuing the I-880 southbound off-ramp). <br />impacts to the southbound I-880 off-ramp <br />at Marina Boulevard during the Saturday <br />peak period. <br />TR-17. Under both Cumulative plus <br />Kaiser Medical Center Phase 1 plus <br />Mixed-Use Retail Development conditions <br />and Cumulative plus Kaiser Medical <br />Center Build-Out plus Mixed-Use Retail <br />Development conditions, the project <br />would significantly affect CMP-designated <br />roadways. <br />TR-17.1Add travel lanes to roadway sections and improve traffic management <br />s sv tem• <br />The project sponsors shall contribute fair-share funds towards the construction of <br />additional travel lanes to each of the impacted roadway sections in the direction of <br />travel impacted by the proposed project. In addition, the project sponsors shall <br />contribute fair-share funds towards the overall improvement to the City's traffic <br />management system including the installation of necessary equipment to implement <br />a traffic adaptive signal control system along affected corridors. <br />San Leandro Engineering & <br />Transportation Department , <br />Land Use Division, <br />Transportation Section - <br />Determination and collection of <br />fair share sum <br />Kaiser shall either enter into <br />a public improvement <br />agreement for these <br />improvements prior to <br />issuance of building permits <br />for the Medical Center <br />Buildout, or shall make fair- <br />share payments prior to <br />issuance of certificates of <br />occupancy for Medical <br />Center Buildout <br />TR-18 Under Cumulative plus Kaiser <br />Medical Center Build-Out plus Mixed-Use <br />Retail Development conditions, the project <br />may not provide sufficient on-site parking <br />spaces to meet the projected parking <br />demand. TR-18.1 Prepare Parking Demand Study. San Leandro Planning Services <br /> <br />The project applicant for the Kaiser Medical Center shall prepare a parking demand <br />study prior to Build-Out and provide sufficient parking as specified by the study. Prior to issuance of building <br />permits, review and approve <br />the parking study <br />Utilities <br />UT-4. The proposed project would UT-4.1 Conduct a capacity impact analysis for the sewer lines serving the proiect San Leandro Building and Safety Prior to the issuance of <br />increase the demand for the treatment of site and pay a fair share contribution to the upgrade of impacted facilities. Services Division building permits, review and <br />wastewater. However, this demand could approve the capacity impact <br />be met with existing treatment facilities. Prior to the issuance of building permits, the project sponsor(s) shall work with the analysis of the sewer lines <br />The proposed project would also result in City of San Leandro to conduct a capacity impact analysis of the sewer lines which <br />an increase in wastewater flows from the connect the project site to the Marina Boulevard sewer line. This analysis shall <br />project site. This increase in wastewater determine if there is sufficient capacity to accommodate the existing and proposed <br />flow may require new or expanded sewer project flows, any necessary upgrades, and the timing required for such upgrades. If <br />lines. This impact would be potentially the analysis determines that the improvements to the sewer lines are necessary, the <br />significant. project sponsor(s) shall pay a fair share contribution, as determined by the City's <br /> City Engineer, to any capacity improvements that would be required to <br /> accommodate the projected wastewater flows of the proposed project prior to <br /> issuance of building permits for that phase of the project. <br />April 22, 2010 Kaiser Permanente San Leandro Medical Center and Mixed-Use Retail Development Project 19/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.