My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 Montgomery Watson Americas Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 Montgomery Watson Americas Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 3:43:59 PM
Creation date
7/14/2010 3:38:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/4/2001
Retention
PERM
Document Relationships
Reso 2001-074
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />logged out and returned to construction contractor. Contractor shall not revise the submittals <br />outside the scope of the contract documents without written permission of the City. <br />CONTRACTOR will copy all parties with the submittal log and discuss submittal status at each <br />weekly construction meeting. Submittals becoming due or overdue will be identified and <br />discussed. Time is of the essence in regards to submittal review. Submittals will be reviewed <br />within the turnaround time specified in the contract documents. <br />7) Response to Requests for Information. Using CONTRACTOR supplied CS2 software, <br />CONTRACTOR will log in and track all contractor Requests for Information (RFI). Responses <br />shall be made on CONTRACTOR provided consecutively numbered forms, logged out and <br />returned to the construction contractor. The field staff will respond to all RFI's not requiring the <br />design team's interpretation of design intent. <br />CONTRACTOR will copy all parties with the RFI log and discuss RFI status at each weekly <br />construction meeting. RFI's becoming due or overdue will be identified and discussed Time is <br />of the essence in regards to RFI response. Unless otherwise specified, or if not specified, <br />CONTRACTOR will respond to all RFI's within 7 calendar days. <br />8) Design Clarification Preparation. As necessary during construction, CONTRACTOR <br />will periodically prepare brief Design Clarifications (DC) to clarify contract documents <br />requirements for the contractor. DC's will be sequentially numbered. Simple sketches or <br />marked up contract drawings will be attached to each DC if necessary. DC's requiring extra <br />work will be identified including a written explanation of the reason for the extra work. Design <br />Clarifications requiring extra work shall not be issued to the contractor without written approval <br />of City. The RFI and DC process will be coordinated with the Potential Change Order (PCO) <br />System for items involving extra work. <br />Design clarifications required to correct errors or omissions in the contract documents shall be <br />made without cost to the City. <br />9) Change Order Processing. CONTRACTOR will manage the change order process to <br />help defend the City against unwarranted change orders and to obtain a fair and reasonable price <br />for those items determined to be bonafide extra-work items. Each potential change order item <br />will be assigned an individual PCO number and be logged and tracked. Contractor shall advise <br />the City in writing as to the circumstances of the potential change orders and make a <br />recommendation as to their validity. Upon the City's approval, CONTRACTOR will prepare <br />revised specifications and or simple sketches or marked up contract drawings to define the <br />potential contract change order work scope. CONTRACTOR will also prepare revised <br />documents for DC's necessitating change order work. CONTRACTOR will prepare the request <br />for quotation incorporating several PCO's, for transmittal to the construction contractor. For <br />items over $3,000, CONTRACTOR will prepare an independent cost estimate with which to <br />compare the contractor's cost quotation and negotiate the change order. CONTRACTOR will <br />also evaluate any associated contractor time extension requests. Upon approval of the quotation, <br />the Contractor shall prepare a change order (per City format) and deliver to City for processing. <br />EXHIBIT A Page 3 of 6 <br />AGRE\EXHIBITA.DOC (Word 6.0) <br />