My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 Group 4 Architecture Research + Planning Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 Group 4 Architecture Research + Planning Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2010 10:19:06 AM
Creation date
7/19/2010 11:12:45 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/15/2001
Retention
PERM
Document Relationships
Reso 2001-175
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />I. CONSULTANT'S SCOPE OF BASIC SERVICES: <br />The Consultant's Basic Services consists of the services described in Paragraphs 1.0 through 6.4 <br />below. The Consultant's Basic Services include the services of structural engineer, cost <br />estimating building subconsultants and graphic rendering subconsultant. <br />Phase 1.0 Project Initiation <br />1.1 The Consultant shall review City-provided project information. <br />1.2 The Consultant shall conduct Project Management Team (PMT) Meeting 1. <br />1.3 The Consultant shall observe each of the present Civic Center buildings in the field. <br />1.4 The Consultant shall prepare a project directory, project schedule, and a project goals <br />statement. <br />Phase 2.0 Building and Site Analysis <br />2.1 The Consultant shall conduct a site visit, review as-built drawings for the South Office <br />Building and City Hall. <br />2.2 The consultant shall observe the structural system of the South Office Building and prepare <br />a brief summary of the existing structural system and identify the building code issues <br />for completing a major renovation of the building, for constructing a one story addition <br />to the building, and for adding a second story to the building. <br />2.3 The Consultant shall prepare a summary of the existing mechanical and electrical system <br />issues of the south office building. <br />2.4 The Consultant shall prepare a summary of the existing conditions of the South Office <br />Building's envelope. <br />2.5 The Consultant shall conduct PMT Meeting 2. <br />Phase 3.0 Analysis of Space Needs for the Council Chambers <br />3.1 The Consultant shall observe the existing office spaces in City Hall. <br />3.2 The Consultant shall review the precedent studies of council chambers collected by the <br />City. <br />3.3 The Consultant shall prepare a preliminary program statement of space needs for the <br />Council Chambers. <br />3.4 The Consultant shall conduct PMT Meeting 3 to confirm the City Council Chambers <br />program statement. <br />Exhibit A Page Al of 3 <br />09/26/01 Preliminary City Council Chambers Remodel Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.