My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 Group 4 Architecture Research + Planning Inc (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 Group 4 Architecture Research + Planning Inc (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 5:15:52 PM
Creation date
7/19/2010 4:26:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/19/2001
Retention
PERM
Document Relationships
Reso 2001-197
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., <br />DELIVERABLES: Site Analysis, Conceptual Site Plans and Project Budget <br />Estimate. <br />1.3 SCHEMATIC DESIGN PHASE <br />1.3.1 Based upon the approved Project Master Plan, the Consultant shall prepare a <br />maximum of three alternative approaches to the building and site design for the <br />City's review. <br />1.3.2 Based upon the selected design, the Consultant shall develop Schematic Design <br />drawings and other documents describing the general character and scale of the <br />Project. <br />1.3.3 The Consultant shall prepare a preliminary Statement of Probable Construction <br />Cost. <br />1.3.4 The Consultant shall prepare a preliminary Furniture Plan showing the location of <br />the furniture. <br />1.3.5 The Consultant shall develop a furniture budget. <br />1.3.6 The Consultant shall provide a professional rendering of the Project. <br />DELIVERABLES: Alternative Approaches to Building and Site Design, <br />Schematic Design Drawings, Preliminary Statement of Probable Construction <br />Cost Estimate and Preliminary Furniture Plan <br />2.0 PROJECT SCHEDULE FOR BASIC SERVICES <br />2.1 Programming <br />(Concurrent with 2.2 Site Analysis) <br />4 Weeks <br />2.2 Site Analysis <br />2.3 Schematic Design <br />Total Elapsed Time <br />Exhibit A <br />6/12/95 <br />4 Weeks <br />12 Weeks <br />16 Weeks <br />Page 2 of 4 <br />Manor & Marina/Mulford Branch Libraries Schematic Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.