My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2010 1004
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1004
>
8B Consent 2010 1004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2010 1:47:10 PM
Creation date
9/30/2010 4:16:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/4/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1004
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1004
Reso 2010-129
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. Statement of Qualifications and Interest <br /> • <br /> BERKELEY BAY TRAIL EXTENSION PROJECT AND <br /> MARINA SHORELINE DESIGN <br /> Client naema Plan wart. Plan <br /> Cr T.4 4..+r Y. Mn w <br /> Am ; <br /> Qty of Berkeley Parks Recreation 747 ' <br /> and Waterfront Department J( ¶! Reference a �+ <br /> Deborah Chemin, Sr. Planner /J ^J <br /> 2180 MiNia Street - t <br /> Berkeley, California 94403 { • -? I - f �! - �' L <br /> w <br /> 510 -981-6715 Ph o . r � v - e_ Cr • � o 9 1 Fn '_ <br /> • DChemin@ci.berkeley.ca.us ,e:' ^ >+> ; .' . - - %t^i r - <br /> ' �'•"� <br /> r <br /> ZW ° �' ��I In <br /> Phase 1 Construction Cost: $2,015,000 Overview <br /> Schedule and Current Status: Master Plan 2M led a multi - disciplinary team to provided planning, design and public facilitation <br /> and CEQA Document complete, 2007; services in preparing an integrated master plan and environmental document for a 1.5 mile <br /> Phase 1 Construction to be initiated 2010 extension of the Bay Trail. The route of the Berkeley Bay Trail Extension passes through <br /> Type and Location of Project the Eastshore State Park and along the Marina waterfront to the inlet of the Yacht Basin. <br /> The trail alignment and associated amenity design will transform the western edge of the <br /> • Trail / Shoreline Master Planning Marina from a car - oriented environment to a <br /> pedestrian promenade. Features along the <br /> • <br /> Key Team Members trail alignment include a bridge crossing of Strawberry Creek, windsurf/kayak access to <br /> the San Francisco bay, Interpretive stations, and enhanced safety for pedestrian <br /> • Patrick Miller, 2M Associates circulation at the Southslde Marina and Berkeley ier. Subsequently, bsequently, Phase 1 construction <br /> Scope of Involvement documents to extend the trail through the Eastshore State Park been completed and <br /> • Project Management construction I5 pending. <br /> • Lead Designer Applicability to the Harbor Basin Study <br /> • Permitting Assistance • Master planning <br /> • Cost Projections • Alternatives analysis <br /> • Public / Agency facilitation <br /> • Public access and waterfront design <br /> • Non - motorized boating access <br /> Gay of Son Leandro Harbor Basin Akamativos Study RFP 50538 D -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.