My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2010 1206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1206
>
8C Consent 2010 1206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2010 5:40:18 PM
Creation date
12/2/2010 4:00:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/6/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1206
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1206
Reso 2010-149
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Leandro L1111S 7010 Shuttle Rider Survey <br /> San Leandro LINKS <br /> 2010 Shuttle Rider Survey <br /> Background <br /> The LINKS Shuttle program has been providing free round -trip service from the San Leandro <br /> BART station to employers in West San Leandro since 2001. The overriding objective of the <br /> LINKS shuttle is to serve employers by aiding retention and hiring. In its ninth year of operation, <br /> ridership remains steady and is sometimes at capacity. The rider study measures satisfaction and <br /> use to determine ways to improve the shuttle service. The survey was conducted annually from <br /> 2006 -2008, and now in 2010. <br /> Funding for the shuttle has been provided by various agencies, including the City of San Leandro <br /> Redevelopment Agency, a West San Leandro Business Improvement District (BID), a Low <br /> Income Federal Transportation (LIFT) grant, as well as grants from the Bay Area Air Quality <br /> Management District and the Metropolitan Transportation Commission. <br /> Sun'ey Methodology <br /> The survey was administered to shuttle riders on September 28` and 29 during the morning and <br /> afternoon hours of shuttle operation. Both Spanish and English versions were available. A total <br /> of 202 responses were collected, the highest response in the four years that the survey has been <br /> conducted. The high response may be partly attributable to the fact that an incentive was offered. <br /> Respondents were offered "Carrot Cash" - S10 in gift certificates donated by the San Leandro <br /> Farmer's Market. <br /> In the four years that the survey has been conducted, the questionnaire hasn't changed much, so <br /> the results are directly comparable year to year. A copy of the questionnaire is included in the <br /> Appendix. <br /> Valerie Brock Consulting 2 October 2010 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.