My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2010 Applied Materials & Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2010
>
Agmt 2010 Applied Materials & Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:22:38 PM
Creation date
12/13/2010 5:19:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/6/2010
Retention
PERM
Document Relationships
Reso 2010-145
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM= LOE E MATERIALS Ea ®oaEr�QUac�p o a©e <br /> oakland, CA 94608 FAX (510) 420 -8186 <br /> email: info @appmateng.com <br /> ESTUDILLO CALLAN 2008 PARKING GARAGE <br /> SAN LEANDRO, CA <br /> B. SPECIAL INSPECTIONS & TESTS <br /> For each of the disciplines requiring our services we have provided the basis used by us for determining the <br /> fees. The following is a summary of our testing and inspection fees, followed by a detailed breakdown: <br /> SUMMARY OF FEES <br /> 1 Reinforced Concrete 5 34,080.00 <br /> 2 Post- Tensioned Concrete 21,240.00 <br /> 3 Pre -Cast Concrete 3,840.00 <br /> 4 Structural Masonry 13,580.00 <br /> 5 Structural Steel & Stairs 16,000.00 <br /> 6 Mileage (Allowance) 1,540.00 <br /> 7 Project Management/Mtgs. 6,000.00 <br /> 8 Final Affidavit 390.00 <br /> TOTAL $ 96,670.00 <br /> BASIS FOR FEES <br /> 1 Reinforced Concrete <br /> Basis: The following quantities and placements are per our estimates. <br /> Per project specs. a set of 6 cylinders will be sampled every 100 cu. yds. <br /> Cu. No. of Sets of INSPECTION HOURS <br /> Yds. Placements Cylinders Reinforcing Concrete <br /> Drilled Piers 1200 6 12 20 48 <br /> Grade Beams 475 2 5 12 16 <br /> Wall & Elevator Footings 350 2 4 12 16 <br /> SOG 520 2 6 10 16 <br /> Ductile Columns 220 4 4 32 32 <br /> Ductile Beams 220 8 8 32 32 <br /> Walls on Line B 50 4 4 16 16 <br /> Miscellaneous 40 3 3 12 12 <br /> Total 3075 31 46 146 188 <br /> a) Reinforcing Placement Inspection. 146 hours @ $80.00 per hour 11,680.00 <br /> b) Concrete Placement Inspection: 188 hours @ $80.00 per hour 15,040.00 <br /> c) Concrete Cylinder Tests 46 sets @ $160.00 per set of 6 cylinders 7,360.00 <br /> • Sub -Total $ 34,080.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.