2 Post - Tensioned Concrete <br /> Basis: The following quantities and placements were estimated by us. <br /> Per project specifications a set of 8 cylinders will be sampled even' 100 cu. yds. <br /> Per project specifications we will review mill -certs for the PT tendons, no testing is required. <br /> Cu. No. of Sets of INSPECTION HOURS <br /> Yds. Pours Cylinders Reinf/PT Concrete Stressing <br /> Levels 2.3 & 4 1560 6 18 72 96 48 <br /> Total 1560 6 18 72 96 48 <br /> a) Reinforcing/PT: 72 hours @ $80.00 per hour 5,760.00 <br /> b) Concrete Inspections: 96 hours @ $80.00 per hour 7,680.00 <br /> c) Stressing Inspections: 48 hours @ S80.00 per hour 3,840.00 <br /> d) Cylinder Tests: 18 sets @ $220.00 per set of 8 cylinders 3,960.00 <br /> Sub -Total $ 21,240.00 <br /> 3 Pre -Cast Concrete <br /> Basis: Per project specifications, the pre -cast columns and beams are to be inspected by an Agency <br /> hired by the contractor. As requested, we are budgeting 4 visits to the Precast Fabricator (Clark <br /> Pacific) in Sacramento. <br /> a) Precast Inspections 48 hours @ $80.00 per hour $ 3,840.00 <br /> 4 Structural Masonry <br /> Basis: The masonry walls at the first level are — 8,000 sq ft. We are budgeting 3 grout placements (24 <br /> hours) and four additional visits to inspect the block work and to inspect rebar (16 hours). <br /> The masonry walls per level for levels 2 -3 are —5,500 sq ft. For each level, we are budgeting <br /> inspections as follows: <br /> Block work : 3 days; 12 hours <br /> Grout placements 2 days; 16 hours <br /> Composite Prism 1 set <br /> We will provide block inspection on an intermittent basis and be present for the grout placemen <br /> Per project specifications, we will test the two types of block (8" & 12 ") for strength, moisture <br /> absonion and moisture content. <br /> a) Block placement, 10, 4 hour trips 52 hours @ $80.00 per hour $ 4,160.00 <br /> b) Grout placement; 7, 8 hour trips 72 hours a $80.00 per hour 5,760.00 <br /> c) Block Tests 2 sets rr $275.00 per set 550.00 <br /> d) Mortar samples: 8 sets @ $120.00 per set 960.00 <br /> e) Grout samples: 7 sets @ $150.00 per set 1,050.00 <br /> 0 Composite prisms 4 sets a $275.00 per set 1,100.00 <br /> Sub -Total $ 13,580.00 <br /> 5 Structural Steel & Stairs <br /> Basis: We are including an allowance of 200 hours for all structural welding associated with the three <br /> stairs, elevator, canopy structures and any other structural steel associate with the parking <br /> APPL0[ED OidlflERIIALS Si (EOdiliON(E(ECRICKIES, <br />