My WebLink
|
Help
|
About
|
Sign Out
Home
San Leandro Marina Alts Study_Final
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0321
>
San Leandro Marina Alts Study_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:03:07 AM
Creation date
3/15/2011 1:17:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/21/2011
Retention
PERM
Document Relationships
2A Work Session 2011 0321
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4. Alternatives <br />Capital Improvement Costs <br />Table 4-7 presents a range (30 percent variance) of capital improvement costs associated with <br />each of the three alternatives. These costs include demolition of existing structures as appropriate. <br />Attachments A-E present a detailed breakdown of how these costs were determined. <br />TABLE 4-7 <br />CAPITAL COSTS BY ALTERNATIVEa <br />Cost Range <br />Alternative Low High <br />No Action Alternative <br />$ 4,448,000.00 <br />$ 5,782,400.00 <br />Alternative #1: Marina Parka <br />$ 25,086,000.00 <br />$ 32,612,000.00 <br />Alternative #2: Aquatic Park <br />$ 14,058,000.00 <br />$ 18,275,400.00 <br />Alternative #3: Nature Park <br />$ 17,079,000.00 <br />$ 22,202,700.00 <br />a Includes all dredging and permitting costs. <br />SOURCE: 2M Associates <br />Work identified is for improvements that might be considered interior to the existing perimeter <br />Harbor Basin walkway and the walkway itself. Park and public amenity proposals identified in <br />landside developer's Discussion Plan are not included. No major infrastructure upgrades are <br />included in the cost analysis and are assumed to be integrated into overall Harbor Basin <br />redevelopment costs. <br />It should be noted that many features in the different alternatives are interchangeable. For example, <br />a pedestrian bridge across the mouth of the Harbor Basin as illustrated in the Nature Park <br />Alternative could be added to the Aquatic Park Alternative. Additionally, costs for some features, <br />such as a Nature Center as represented in the Nature Park Alternative, could vary widely depending <br />on the scale, style, types of materials and exhibitory used in the structure. Therefore many costs that <br />enter into the calculations should be viewed as "reasonable" costs. <br />Operational Costs <br />Table 4-8 presents current annual operational costs for the Harbor Basin area and a projection of <br />annual operations costs (excluding dredging costs, which are included in Table 4-9, below) that may <br />be anticipated by the City for each alternative. Common to all alternatives, including the No Action <br />Alternative, is the maintenance of the perimeter promenade and associated landscaping. These <br />features are already accommodated in existing City staffing plans. Additional operational <br />assumptions for each are described below. <br />Marina Park: The Marina would operate essentially at the same levels as existed in 2010. <br />Additional staffing would be needed to maintain the beach and program the event space. This <br />is assumed to be approximately a 0.25 full-time equivalent (FTE) maintenance position. The <br />Lagoon Paddle Rental is assumed to be a concession operation associated with the proposed <br />Hotel / Conference Center and would not require City involvement. <br />San Leandro Marina Harbor Basin 4-20 ESA / 210461 <br />Alternatives Study March 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.