My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2011 0502
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0502
>
3A Public Hearing 2011 0502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 4:33:25 PM
Creation date
4/28/2011 3:15:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0502
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0502
Reso 2011-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-083
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-084
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br /> TITLE 6, Chapter 4 FISCAL YEAR 2012 PROPOSED FEES <br /> 6.4.100: FEES. The following foes have been established by the City Council pursuant to venous provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br /> Description _l Current Foe 'Reference FY 2011.12 Proposed Foes <br /> COMMUNITY DEVELOPMENT DEPARTMENT - Bulidhng Regulations Division <br /> 8 Miscellaneous (Continued) <br /> D. Fire Pemtit Filing and Issuance Fee 587.00 plus a lea based on total valuation of work as shown babes 588.20 plus... CPI <br /> E. Fire Permit Re- inspection Processing Foe 50 portent 05 fire pennll filing Now loo to cover counter staff time to collect foes, <br /> and Issuance foe processing related to fire permit inspections <br /> Plan Storage: <br /> New single•farnily end two- family residential building 819.00 $ 19.25 CPI <br /> AA other now buildings 824,80 $ 24.95 CPI <br /> Additions. allemtiona. or repairs 624.80 S 24.95 CPI <br /> Class C Roofs: <br /> E rom To and Indudia0 <br /> 61.00 - 6500.00 5132.00 S 133.85 CPI <br /> 6501.00 - 62,000.00 5132,00 for Ore first 6500 plus 67.50 for loch additional 6100 or fraction $133.85 for the first 5500 plus 57.60 for CPI <br /> thereof. to and including 52,000.00 each additional 5100 or fraction thereof, <br /> to and Including 52.000.00 <br /> 82,001.00 - 625,000.00 8245.00 forgo cast $2,000. plus 524.75 for each additional 51,000 00 or 5248.45 for the first 52.00000 plus CPI <br /> known thereof, to and including 625,000.00 525.10 for each additional 51,000.00 or <br /> fraction thereof, to and Including <br /> 525,000.00 <br /> 825001.00 - 550,000 00 3815.00 or the fast 825,000 plus 822.30 for oath 000NOna1 61, 000.00 or 5826.40 for the first 525.000 plus 522.60 CPI <br /> lmaion 1here01, to and including 650.090 for each additional 61,000.06 or fraction <br /> thereof, to and Including 550,000 <br /> 550,000.00• 51,373.00 Ion the first 650.000 plus 517.00 each 800450nal 51,000.00 or 51,392.20 for the first 550,000 plus CPI <br /> traction thereof $17.25 each additional 51,000.00 or <br /> fraction thereof <br /> (1) IDiroct Cost • hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br /> 6110ta1GEh2011.121FaaV0II OropmM Fees Maeie 9rhewta.aaw 16 4/210011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.