My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent 2011 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0516
>
8O Consent 2011 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2011 2:44:21 PM
Creation date
5/12/2011 5:32:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0516
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0516
Reso 2011-094
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> APPROVED AND <br /> STAFF REPORT FORWARDED <br /> TO CITY COUNCIL <br /> DATE: May 16, 2011 <br /> TO: Stephen L. Hollister, City Manager a L. Hollister <br /> City Manager <br /> FROM: Uchenna Udemezue, Director <br /> Engineering and Transportation apartment <br /> BY: Kenneth Joseph, City Engineer <br /> Engineering and Transportation De? ment <br /> SUBJECT /PROJECT DESCRIPTION: <br /> RESOLUTION OF AWARD OF CONSTRUCTION CONTRACT TO STATE ROOFING <br /> SYSTEMS, INC. FOR THE ROOF REPLACEMENT AND ACCESSORIES (YEAR 3) <br /> PROJECT, PROJECT NO. 09- 687 -18 -104. <br /> SUMMARY AND RECOMMENDATION <br /> Staff recommends award of contract to the low bidder, State Roofing Systems, Inc. in the amount <br /> of $195,608 for the subject project. <br /> BACKGROUND <br /> A roof survey was conducted in 2006 to evaluate the condition of all roofs on City - owned <br /> buildings. Each roof was assessed and a plan for repair or replacement, along with cost <br /> estimates, was developed. The roofs requiring repair or replacement were grouped into separate <br /> program years for budgetary reasons. In 2008, roof repairs at the Marina Community Center and <br /> the Public Safety Building were completed as part of Year 1. Year 2 construction, which <br /> included roof repair or replacement at the Main Library's Karp Room, Fire Station #12, and <br /> several buildings at the Public Works Services Center including Public Works <br /> Shipping/Receiving, Garage/Truck Bay, Electrical, and Landscape Buildings, was completed in <br /> 2009. <br /> Year 3 will replace the roof at the Helen Lawrence South Offices Building. This work will be <br /> coordinated with the replacement of the heating, ventilation, and air conditioning equipment <br /> being installed under the supervision of the Public Works Services Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.