My WebLink
|
Help
|
About
|
Sign Out
Home
8R Consent 2011 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0620
>
8R Consent 2011 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2011 5:19:12 PM
Creation date
6/16/2011 4:37:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0620
Reso 2011-128
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Toyon Park Restroom Replacement Sitework <br />Award of Contract <br />Analysis <br />June 20. 20 11 <br />The City Council approved the plans and specifications and called for bids on May 16, 2011. <br />The bids were opened on Monday, June 13, 2011. Three (3) bids were received ranging from <br />$84,700 to $129,000. McNabb Construction is the lowest responsible bidder based on a base bid <br />of $84,700. The engineer's estimate for the base bid work is $76,609. <br />The project involves completing all necessary site preparation for placement of the pre- fabricated <br />restroom building. Such preparations include: 1) preparation of the new building sub - grade; 2) <br />relocation of utility connections; 3) installation of a new accessible parking stall; 4) installation <br />of a new drinking fountain; and 5) other miscellaneous site work. Once the site has been <br />prepared, the project contractor will coordinate with PRC for delivery and installation of the new <br />building. The existing restroom will remain open during the work, and once the new restroom is <br />installed, the contractor will demolish and remove the existing restroom. <br />Current City Council Policy <br />To upgrade City parks and park play equipment to comply with Americans with Disabilities Act <br />(ADA) requirements. <br />Previous City Council Action(s) <br />• On May 16, 2011, by Resolution 2011 -091, the City Council approved Plans and <br />Specifications and called for bids on the subject project <br />• On December 6, 2010, by Resolution 2010 -146, the City Council authorized a sole- source <br />contract with Public Restroom Company to provide a pre- fabricated restroom for the subject <br />project <br />• On June 18, 2007, by Resolution No. 2007 -078, the City Council adopted the budget for <br />Fiscal Year 2007 -2008 that provided CIP funds in Account No. 210 -62 -008 <br />Applicable General Plan Policy <br />Conforms to General Plan Goal 21.01, which encourages both renovation and ADA upgrades of <br />City parks. <br />Permits and /or Variances Granted <br />• A building permit for the pre- fabricated restroom will be obtained by the vendor from the <br />Division of State Architect (DSA) <br />• This project will obtain an electrical permit for the new electrical service to the pre- fabricated <br />restroom <br />
The URL can be used to link to this page
Your browser does not support the video tag.