Laserfiche WebLink
this task, a budget equivalent to about 4,840 hours have been included but can be higher or lower <br />depending on the actual effort required. <br />Information Provided by City: <br />• Shop drawing submittals and resubmittals (from Contractor). <br />Consultant Deliverables: <br />• Written comments on submittals and resubmittals. <br />• Updates on hours and budget spent on submittals and shop drawings included with the <br />monthly progress summary letter. <br />Task 4 - Other Engineering Support Services <br />Consultant shall provide engineering support services specified herein to assist the City and plant <br />staff during the construction period. <br />Task 4.1 — Conformed Drawings and Specifications. Consultant and Consultant's project <br />architect shall prepare conformed drawings and specifications using Consultant's standard <br />format to include changes contained in the seven (7) addenda issued during the bid period. <br />Information Provided by City: <br />• Printing of conformed documents (provide 10 half -size hard copies to Consultant). <br />Consultant Deliverables: <br />• One electronic copy of conformed drawings (pdf) and specifications (pdf and individual <br />MS Word files). <br />• Auto CAD files with .ctb files, plot configuration files, and Xref drawings. <br />Task 4.2 — Review Value Engineering Proposals. Consultant shall perform review formal <br />value engineering proposals submitted by the Contractor. For this task, a budget equivalent to <br />about 240 hours have been included but can be higher or lower depending on the actual effort <br />required. <br />Information Provided by City: <br />• Value engineering proposals (from Contractor). <br />Consultant Deliverables: <br />• Written responses to value engineering proposals <br />Task 4.3 — Review Substitution Requests. Consultant shall perform review of 10 equipment <br />substitution (or- equal) request reviews submitted by the Contractor. For this task, a budget <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 19 <br />