My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equivalent to about 300 hours have been included but can be higher or lower depending on the <br />actual effort required. <br />Information Provided by City: <br />• Formal equipment substitution requests (from Contractor). <br />Consultant Deliverables: <br />• Written responses to substitution requests. <br />Task 4.4 — Review Project Schedules. Consultant and Consultant's scheduler shall review the <br />following project schedules: 1 preliminary baseline schedule, 1 final baseline schedule, and 30 <br />monthly project schedule updates. Consultant and Consultant's scheduler shall attend two <br />meetings with City and Contractor to discuss schedule submittal format and procedures and <br />review baseline schedule comments. The schedule reviews will include checking for compliance <br />with contract requirements, construction activities and duration, cost - loading logic, schedule <br />analysis, critical -path analysis, narrative analysis, and delay recovery means. <br />Information Provided by City: <br />• Project schedules in electronic format (from Contractor). <br />Consultant Deliverables: <br />• Summary memos with comments after each schedule review. <br />Task 4.5 — Witness Factory Tests. Consultant shall witness factory testing of the following <br />equipment for this project. <br />• Mechanical Bar Screens (Section 11332). <br />• Process Control and Instrumentation Systems (Section 17050). <br />For this task, a budget equivalent to about 80 hours have been included but can higher or lower <br />depending on the actual effort required. <br />Information Provided by City: <br />• Construction schedule updates as related to the above listed elements. <br />Consultant Deliverables: <br />• Letter report summarizing findings from each testing witnessing. <br />Task 4.6 — Final Inspection. Consultant shall assist the City in performing a final project "walk - <br />through" inspection in preparing a final punch list of outstanding items to be completed by the <br />Contractor to achieve final acceptance. These include: equalization facilities, headworks bar <br />screens and influent pump station, primary clarifiers, FFR and support facilities, biofilter <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 20 <br />