My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facilities, digesters, administration control building, and remaining portion of the project. For this <br />task, a budget equivalent to about 140 hours have been included but can be higher or lower <br />depending on the actual effort required. <br />Information Provided by City: <br />• None. <br />Consultant Deliverables: <br />• Field memos on punch -list items for various facilities. <br />Task 4.7 — Geotechnical Engineering Support Services. Consultant's geotechnical engineer <br />(Fugro) shall provide the following services: field services, laboratory services, and office <br />services for construction of the WPCP Rehabilitation Project for applicable new structures listed <br />on structural sheets 172 through 229 and structural sheets 459 to 481. <br />• General services: Fugro will monitor project progress and field observation and testing <br />services, provide onsite geotechnical consultants, review project plans, and attend project <br />meetings on an as- requested basis. As part of each site visit, a computer - generated Daily <br />Field Report (DFR) will be prepared to document the day's geotechnical- related <br />construction activities, together with the results of field density tests taken that visit. Final <br />reviewed copies will be submitted to the City at the City's request. <br />• Site preparation and mass grading: For building pad preparation, Fugro will provide part- <br />time observation during excavation of undocumented fills, and full -time observation and <br />nuclear gauge density testing during fill placement and compaction. <br />• Fixed Film Reactor Construction: During construction of the FFR, Fugro will be on -site <br />full -time to observe the installation of soil cement columns, and their engineering <br />technician will provide full -time observation and testing during fill placement and <br />compaction, and/or observation and sampling of lightweight concrete placement, if <br />needed. <br />• Trench and retaining wall backfill: For underground utility line trench and retaining wall <br />backfill operations within a 1:1 prism extending out from the bottom of slab foundations, <br />Fugro will provide part-time to full -time observation and nuclear gauge density testing <br />services during fill placement and compaction, including lightweight fill for deep <br />trenches extending into bay margin soils. The effort included in the scope is based on <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.