My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Responses to RFIs, submittals, and change order responses, and LEED certification <br />documentation. <br />Task 5 - On -Site Engineering Support <br />Consultant shall provide on -site engineering support services to assist City and Contractor during <br />certain periods of the construction. <br />Task 5.1 — On -Site Engineering Support. Consultant shall provide on -site engineering support <br />services to assist City and Contractor to perform certain tasks, including but not limited to the <br />following: 1) review and respond to general questions related to the contract documents, 2) <br />review and respond to RFIs, 3) review and respond to submittals and shop drawings, and 4) other <br />support tasks as requested by the City. Consultant shall provide one design engineer familiar <br />with the project to work in the construction trailer two days a week for 60 weeks (120 days) <br />during the construction period. It is anticipated that Consultant's design engineer will only <br />perform this service during the first half of the construction period. The Consultant's design <br />engineer will also attend weekly construction meetings when available. For this task, a budget <br />equivalent to about 840 hours have been included. <br />Information Provided by City: <br />• Working space at City's construction trailer. <br />Consultant Deliverables: <br />• On -site engineering support. <br />Task 6 - Startup /Training <br />Consultant shall provide selected startup /training services outlined herein to the City and plant <br />staff. <br />Task 6.1 — Startup Assistance. Consultant shall provide as- requested startup assistance to the <br />City and plant staff during startup of the new facilities. Consultant's Operations Specialist shall <br />be available on an as- needed basis to resolve startup and process setting adjustment issues and <br />provide general consultation regarding equipment installation issues. For this task, a budget <br />equivalent to about 160 hours have been included but can be higher or lower depending on the <br />actual effort required. <br />Information Provided by City: <br />• Startup questions. <br />Consultant Deliverables: <br />• Startup solutions. <br />Task 6.2 — Operations Training. Consultant shall perform an overview training to the plant <br />staff on the use of the following groups of equipment. <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.