My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Deliverables: <br />• One hard copy of the half -sized and full -size record drawings. <br />• One electronic copy (pdf) of the record drawings. <br />• Auto CAD drawing files with .ctb files, plot configuration files, and Xref drawings. <br />Task 8 - Operation and Maintenance Manual Updates <br />Consultant shall prepare operation and maintenance manual updates for new elements of this <br />project to the plant's exiting manual. <br />Task 8.1 — Operation and Maintenance Manuals Updates. Consultant shall prepare new <br />chapters to the plant's existing operation and maintenance (O &M) manual in paper format for <br />the WPCP Rehabilitation Project that include following new facilities. <br />• Influent Pump Station <br />• Headworks Bar Screens <br />• Grit Facility <br />• Preliminary Treatment Biofilter <br />• Primary Clarifier No. 3 <br />• Fixed Film Reactor <br />• Fixed Film Reactor Biofilter <br />• Fixed Film Reactor Lift Station <br />• Equalization Pump Station <br />• Secondary Clarifier No. 2 <br />• Equalization Basin <br />• Equalization Pond <br />• Equalization Return Pump Station <br />• Electrical System <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.