Laserfiche WebLink
Consultant Deliverables: <br />• One hard copy of the half -sized and full -size record drawings. <br />• One electronic copy (pdf) of the record drawings. <br />• Auto CAD drawing files with .ctb files, plot configuration files, and Xref drawings. <br />Task 8 - Operation and Maintenance Manual Updates <br />Consultant shall prepare operation and maintenance manual updates for new elements of this <br />project to the plant's exiting manual. <br />Task 8.1 — Operation and Maintenance Manuals Updates. Consultant shall prepare new <br />chapters to the plant's existing operation and maintenance (O &M) manual in paper format for <br />the WPCP Rehabilitation Project that include following new facilities. <br />• Influent Pump Station <br />• Headworks Bar Screens <br />• Grit Facility <br />• Preliminary Treatment Biofilter <br />• Primary Clarifier No. 3 <br />• Fixed Film Reactor <br />• Fixed Film Reactor Biofilter <br />• Fixed Film Reactor Lift Station <br />• Equalization Pump Station <br />• Secondary Clarifier No. 2 <br />• Equalization Basin <br />• Equalization Pond <br />• Equalization Return Pump Station <br />• Electrical System <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 26 <br />