Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: WPCP Rehabilltatlon Project <br />PROJECT NO.: 08- 593.52.239 "As was disch <br />Rln mr) • 4n -41 nay <br />BID OPENING <br />ENQINEER'S ESTIMATE <br />Monterey Mechanical Co. <br />Proven Management, Inc. <br />F&H Construction <br />DATE: Wedneday, April 12, 2011 <br />Date Approved: 3/15/2011 <br />8275 San Leandro Street <br />712 Sansome Street <br />4945 E. Waterloo Road <br />TIME: 3:00 PM <br />Prepared by: KC <br />Oakland, CA 94821 <br />San Francisco, CA 94111 -1704 <br />Stockton, CA 95215 <br />LOCATION: City Clerk <br />Phone: 610 -632 -3173 <br />Phone: 05-421-0500 <br />Phone: 209-931-3738 <br />Fax: 510 -632 -0732 <br />Fax: 416-421-9600 <br />Fax: 209 -931 -4427 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID: <br />1 <br />1 LS <br />Sheeting, shoring, and bracing <br />$1,000,000.00 <br />$1,000,000.00 <br />$1,400,000.00 <br />$1,400,000.00 <br />$2,200,000.00 <br />$2,200,000.00 <br />$2,300,000.00 <br />2,300,000.00 <br />of all excavations <br />2 <br />1 LS <br />Preparation and submittal of a <br />$50,000,00 <br />$60,000.00 <br />$10,000.00 <br />$10,000.00 <br />$40,000.00 <br />$40,000.00 <br />$20,000.00 <br />$20,000.00 <br />written geotachnical report as <br />specified in Section 02260 <br />3 <br />f LS <br />Preparation and submittal of <br />$150,000.00 <br />$160,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />record drawings as specified in <br />Section 01720 <br />4 <br />1 LS <br />Certified Payroll as specified in <br />$36,000.00 <br />$36,000.00 <br />$15,000.00 <br />$15,000.00 <br />$10,000.00 <br />$10,000.00 <br />$45,000.00 <br />$45,000.00 <br />Section 000700 -7.2.k <br />5 <br />1 LS <br />Preparation and subittal of <br />$150,000.00 <br />$150,000.00 <br />$160,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />schedules specified in Section <br />01324 <br />6 <br />1 LS <br />All work required by the plans <br />$43,111,000.00 <br />$43,111,000.00 <br />$37,709,000.00 <br />$37,709,000.00 <br />$39,911,686.00 <br />$39,911,686.00 <br />$39,914,000.00 <br />$39,914,000.00 <br />and specifications except that <br />Included in Bid Item Nos. 1 to 5 <br />and Bid Alternative A <br />TOTAL BASE BID: $44,497,000.00 <br />$39,434,000.00 <br />$42,4611,686.00 <br />$42,579,000.00 <br />BID ALTERNATE NO. 1 <br />28 <br />1 LS <br />Administration Control Building <br />$4,056,000.00 <br />$4, 056, 000.00 <br />$6,775,000.00 <br />$6,775,000.00 <br />1 $4, 869, 715.00 <br />$4,869,715.00 <br />1 $4,770,000.00 <br />$4,770,000.00 <br />Expansion <br />Bid Summary Y Ah Alternates -WPCP Rehab ProjeN-Afi Page 3 of 6 Printed 41612011 @ 9 :54 AM <br />