Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />DATE: Thursday, June 2, 2011 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ENGINEER'S ESTIMATE <br />Date Approved: <br />Prepared by: KL <br />Ghilotti Construction Company, Inc. <br />246 Ghilotti Avenue <br />Santa Rosa, CA 95407 <br />Phone: 707 - 585 -1221 <br />1 Fax: 707 -585 -1601 <br />Phone: <br />Fax: <br />Phone: <br />Fax: <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />26 <br />1 EA <br />Furnish & Install Bolt -Down <br />$400.00 <br />$400.00 $500.00 <br />$500.00 <br />$0.00 <br />$0.00 <br />Truncated Dome Panel <br />27 <br />451 LF <br />Curb & Gutter <br />$45,00 <br />$20,295.00 $46.00 <br />$20,746.00 <br />$0.00 <br />$0.00 <br />28 <br />143 SF <br />Sidewalk <br />$14.00 <br />$2,002.00 $24.00 <br />$3,432.00 <br />$0.00 <br />$0.00 <br />29 <br />77.5 SF <br />Driveway (8 ") <br />$18.00 <br />$1,395.00 $40.00 <br />$3,100.00 <br />$0.00 <br />$0.00 <br />30 <br />277 SF <br />Valley Gutter <br />$15.00 <br />$4,155.00 $20.00 <br />$5,540.00 <br />$0.00 <br />$0.00 <br />31 <br />9 LF <br />Sawcut at Lip of Gutter Prior to <br />$6.00 <br />$54.00 $8.00 <br />$72.00 <br />$0.00 <br />$0.00 <br />AC Milling <br />32 <br />1 LS <br />Install 3 -Way Pedestrian <br />$7,000.00 <br />$7,000.00 $12,500.00 <br />$12,500.00 <br />$0.00 <br />$0.00 <br />Pathway <br />33 <br />4 EA <br />Install Type I Pedestrian <br />$800.00 <br />$3,200.00 $400.00 <br />$1,600.00 <br />$0.00 <br />$0.00 <br />Barricade with R49 Sign <br />34 <br />12 EA <br />42" High Yellow Tubular <br />$65.00 <br />$780.00 $52.00 <br />$624.00 <br />$0.00 <br />$0.00 <br />Delineators with Rubber Base <br />35 <br />1 LS <br />Construct 4" Thick AC Pathway <br />$750.00 <br />$750.00 $5,500.00 <br />$5,500.00 <br />$0.00 <br />$0.00 <br />36 <br />10 EA <br />Construct Type -A Sanitary <br />$8,500.00 <br />$85,000.00 $32,500.00 <br />$325,000.00 <br />$0.00 <br />$0.00 <br />Sewer Manhole Per City Std <br />Plan No. 214 <br />37 <br />3 EA <br />Open Top Half of Thru -Pipe in <br />$1,500.00 <br />$4,500.00 $12,000.00 <br />$36,000.00 <br />$0.00 <br />$0.00 <br />SSMH and Construct Concrete <br />Shelf at Manhole Base <br />38 <br />1 LS <br />Abandon 6" Sanitary Sewer Line <br />$1,000.00 <br />$1,000.00 $6,000.00 <br />$6,000.00 <br />$0.00 <br />$0.00 <br />39 <br />1 LS <br />Remove and Replace Portion of <br />$1,500.00 <br />$1,500.00 $2,200.00 <br />$2,200.00 <br />$0.00 <br />$0.00 <br />15" VCP Sanitary Sewer and <br />Lower Inflow <br />40 <br />80 EA <br />Potholing (Locate Underground <br />$100.00 <br />$8,000.00 $350.00 <br />$28,000.00 <br />$0.00 <br />$0.00 <br />Utilities) <br />41 <br />1 LS <br />Prepare and Submit Final <br />$1,000.00 <br />$1,000.00 $200.00 <br />$200.00 <br />$0.00 <br />$0.00 <br />Report on Utilization of DBEs <br />(Form CEM- 2402F) <br />Bid Summary- Marina Blvd Street Rehabilitation.xls Page 8 of 10 Printed 716/2011 Q 11:48 AM <br />