My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2011 0705 Supplement
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8G Consent 2011 0705 Supplement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2011 3:34:57 PM
Creation date
7/7/2011 3:34:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/6/2011
Retention
PERM
Document Relationships
8G Consent 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />131D OPENING <br />ENGINEER'S ESTIMATE <br />Ghilotti Construction Company, Inc. <br />DATE: Thursday, June 2, 2011 <br />Date Approved: <br />246 Ghilotti Avenue <br />TIME: 3:00 PM <br />Prepared by: KL <br />Santa Rosa, CA 95407 <br />LOCATION: City Clerk <br />Phone: 707- 585 -1221 <br />Phone: <br />Phone: <br />Fax: 707 -585 -1601 <br />Fax: <br />Fax: <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />42 <br />4 EA <br />Bike Lane Signs & Post <br />$600.00 <br />$2,400.00 $275.00 <br />$1,100.00 <br />$0.00 <br />$0.00 <br />4� <br />42 TN <br />Asphalt Concrete Paving at <br />$89.00 <br />$3,738.00 $115.00 <br />$4,830.00 <br />$0.00 <br />$0.00 <br />Heron Bay <br />44 <br />63 TN <br />314" Max Aggregate Base <br />$83.00 <br />$5,229.00 $60.00 <br />$3,780.00 <br />$0.00 <br />$0.00 <br />45 <br />178 LF <br />Redwood Header Board <br />$3.00 <br />$534.00 $12.00 <br />$2,136.00 <br />$0.00 <br />$0.00 <br />46 <br />50 CY <br />Excavation at Heron Bay <br />$30.00 <br />$1,500.00 $42,00 <br />$2,100.00 <br />$0.00 <br />$0.00 <br />47 <br />1 LS <br />Adjust Irrigation System at <br />$500.00 <br />$500.00 $800.00 <br />$800.00 <br />$0.00 <br />$0.00 <br />Heron Bay <br />48 <br />2,950 SY <br />Fog Sealing at Heron Bay <br />$2.50 <br />$7,375.00 $0.24 <br />$708.00 <br />$0.00 <br />$0.00 <br />49 <br />387 SF <br />Install Curb Ramp w/ Truncated <br />$16.50 <br />$6,385.50 $26.00 <br />$10,062.00 <br />$0.00 <br />$0.00 <br />Domes Per City Std Plan No. <br />106A and 1066 (TDA- Funded) <br />50 <br />58 LF <br />Curb & Gutter (TDA - Funded) <br />$45.00 <br />$2,610.00 $69.00 <br />$4,002.00 <br />$0.00 <br />$0.00 <br />51 <br />8 EA <br />Install Pedestrian Push Button <br />$150.00 <br />$1,200.00 $220.00 <br />$1,760.00 <br />$0.00 <br />$0.00 <br />I to be Furnished by City <br />TOTAL BASE BID: $1,081,077.90 <br />$1,563,228.00 <br />$0.00 <br />$0.00 <br />BID ALTERNATE NO. 1 <br />Al <br />18 EA <br />Adjust Water Valve Pot Frame <br />$800.00 <br />$14,400.00 $390.00 <br />$7,020.00 <br />$0.00 <br />$0.00 <br />& Cover to Grade (Nan - <br />Participating) <br />TOTAL BID ALTERNATE NO. 1: $14,400.00 <br />$7,020.00 <br />$0.00 <br />$0.00 <br />TOTAL BASE BID: $1,081,077.90 $1,563,228.00 $0.00 $0.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$14,400.00 $7,020.00 $0.00 $0.00 <br />TOTAL BID: $1,095,477.90 $1,570,248.00 $0.00 $0.00 <br />Bid Summary- Marina Blvd Street Rehabilitation.xls Page 9 of 10 Printed 71612011 @ 11:48 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.