My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2011 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2011
>
Agmt 2011 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2011 12:32:59 PM
Creation date
7/21/2011 12:32:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
Reso 2011-133
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this task, a budget equivalent to about 4,840 hours have been included but can be higher or lower <br /> depending on the actual effort required. <br /> Information Provided by City: <br /> • Shop drawing submittals and resubmittals (from Contractor). <br /> Consultant Deliverables: <br /> • Written comments on submittals and resubmittals. <br /> • Updates on hours and budget spent on submittals and shop drawings included with the <br /> monthly progress summary letter. <br /> Task 4 - Other Engineering Support Services <br /> Consultant shall provide engineering support services specified herein to assist the City and plant <br /> staff during the construction period. <br /> Task 4.1 — Conformed Drawings and Specifications. Consultant and Consultant's project <br /> architect shall prepare conformed drawings and specifications using Consultant's standard <br /> format to include changes contained in the seven (7) addenda issued during the bid period. <br /> Information Provided by City: <br /> • Printing of conformed documents (provide 10 half -size hard copies to Consultant). <br /> Consultant Deliverables: <br /> • One electronic copy of conformed drawings (pdf) and specifications (pdf and individual <br /> MS Word files). <br /> • Auto CAD files with .ctb files, plot configuration files, and Xref drawings. <br /> Task 4.2 — Review Value Engineering Proposals. Consultant shall perform review formal <br /> value engineering proposals submitted by the Contractor. For this task, a budget equivalent to <br /> about 240 hours have been included but can be higher or lower depending on the actual effort <br /> required. <br /> Information Provided by City: <br /> • Value engineering proposals (from Contractor). <br /> Consultant Deliverables: <br /> • Written responses to value engineering proposals <br /> Task 4.3 — Review Substitution Requests. Consultant shall perform review of 10 equipment <br /> substitution (or- equal) request reviews submitted by the Contractor. For this task, a budget <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.