equivalent to about 300 hours have been included but can be higher or lower depending on the <br /> actual effort required. <br /> Information Provided by City: <br /> • Formal equipment substitution requests (from Contractor). <br /> Consultant Deliverables: <br /> • Written responses to substitution requests. <br /> Task 4.4 — Review Project Schedules. Consultant and Consultant's scheduler shall review the <br /> following project schedules: 1 preliminary baseline schedule, 1 final baseline schedule, and 30 <br /> monthly project schedule updates. Consultant and Consultant's scheduler shall attend two <br /> meetings with City and Contractor to discuss schedule submittal format and procedures and <br /> review baseline schedule comments. The schedule reviews will include checking for compliance <br /> with contract requirements, construction activities and duration, cost - loading logic, schedule <br /> analysis, critical -path analysis, narrative analysis, and delay recovery means. <br /> Information Provided by City: <br /> • Project schedules in electronic format (from Contractor). <br /> Consultant Deliverables: <br /> • Summary memos with comments after each schedule review. <br /> Task 4.5 — Witness Factory Tests. Consultant shall witness factory testing of the following <br /> equipment for this project. <br /> • Mechanical Bar Screens (Section 11332). <br /> • Process Control and Instrumentation Systems (Section 17050). <br /> For this task, a budget equivalent to about 80 hours have been included but can higher or lower <br /> depending on the actual effort required. <br /> Information Provided by City: <br /> • <br /> • Construction schedule updates as related to the above listed elements. <br /> Consultant Deliverables: <br /> • Letter report summarizing findings from each testing witnessing. <br /> Task 4.6 — Final Inspection. Consultant shall assist the City in performing a final project "walk - <br /> through" inspection in preparing a final punch list of outstanding items to be completed by the <br /> Contractor to achieve final acceptance. These include: equalization facilities, headworks bar <br /> screens and influent pump station, primary clarifiers, FFR and support facilities, biofilter <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 20 <br />