My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2011 Golden Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2011
>
Agmt 2011 Golden Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 10:19:59 AM
Creation date
7/25/2011 10:19:57 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
Reso 2011-150
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
comments with responses cited immediately below each comment. Issue <br /> report two weeks after meeting. <br /> • Use and reference City standard details wherever possible. <br /> • Assist City in project bidding and response to bidder request for information <br /> (BFI's). Prepare addenda as necessary during bid phase. <br /> 3.2 Deliverables <br /> Public Meeting / Project Alternate Selections: With the assistance of City Staff, <br /> Consultant shall prepare three (3) overall Project Alternatives for presentation to <br /> the public and the City Facilities Committee. The project alternates will be used <br /> to solicit input on specific themes and landscape elements. At a minimum, these <br /> alternates shall provide options for the following design elements: <br /> • Storm water treatment plantings <br /> • Tree selections <br /> • Street lights <br /> • Gateway monuments <br /> • Crosswalk treatments <br /> • Pasco Corridor Connection <br /> • Bart Forecourt Area <br /> Budget and feasibility constraints shall also be reviewed for each Project <br /> Alternative. <br /> PSE Submittal l - "Design Intent ": PS &E that will develop the limits of the curbs and <br /> planter areas and establish the basic project constraints, such as the extent of <br /> landscape plantings to meet stormwater requirements, location of planters and <br /> trees, utility conflicts and service point of connections. <br /> PSE Submittal 2 — "Design Review ": PS &E that will include all construction details and <br /> specifications for City review; includes cost estimate and compete technical <br /> specifications. <br /> Service Application and Encroachment Permit Submittal.: Consultant to provide all <br /> necessary information and drawings to include with City prepared encraochment <br /> permit submittal to Caltrans and Bart, as well as service applications for PG &E <br /> and EBMUD. Consultant shall respond to comments from these agencies as <br /> appropriate. <br /> PSE Submittal 3 — "Pre -bid Review": PS &E for final review are essentially complete <br /> documents that are being checked for consistency with other disciplines as well as <br /> to ensure that all project work is covered in the contract documents to minimize <br /> future design changes and potential change orders. <br /> PSE Submittal 4 - "Final PSE': Final plans, specifications, and estimate of probable <br /> construction costs; suitable for public bidding and addressing comments from all <br /> permit and regulatory agencies. During the bidding phase, contractor to provide <br /> assistance clarifying questions and assisting in the preparation of addenda as <br /> Consulting Services Agreement between July 18, 2011 <br /> City of San Leandro and Golden Associates — Exhibit A Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.