Laserfiche WebLink
BID SUMMARY <br />A <br />PROJECT TITLE: ADA Ramp Project 11A2 <br />PROJECT NO.: 2010.014. <br />BID NO.: 11- 12.004 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An award <br />of contract, if any, is subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Monday, August 15, 2011 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ENGINEER'S ESTIMATE <br />Date Approved: 7121/2011 <br />Prepared by: NNC <br />AJW Construction <br />966 81st Avenue <br />Oakland, CA 94621 <br />Phone: 510 - 568 -2300 <br />Fax: 510-639-1578 <br />FBD Vanguard Construction, Inc. <br />651 Enterprise Court <br />Livermore, CA 94550 <br />Phone: 925 - 245 -1300 <br />Fax: 925-245-1007 <br />Sposeto Engineering, Inc. <br />4558 Contractor: Place <br />Livermore, CA 94554 <br />Phone: 925 - 443-4200 <br />Fax: 925-443-5860 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />.: ITEM COST <br />1 <br />450 LF <br />Install curb and gutter per <br />$43.00 <br />$19,350.00 <br />$40.00 <br />$18,000.00 <br />$56.00 <br />$25,200.00 <br />$69.00 <br />$31,050.00 <br />drawing 100 case 3101 <br />2 <br />450 SF <br />Install sidewalk per drawing 100 <br />$11.00 <br />$4,950.00 <br />$15.00 <br />$6,750.00 <br />$11.00 <br />$4,950.00 <br />$10.00 <br />$4,500.00 <br />case 3101 <br />3 <br />2,500 SF <br />Install wheelchair curie cut ramp <br />$14.00 <br />$35,000.00 <br />$15.00 <br />$37,500.00 <br />$14.20 <br />$35,500.00 <br />$16,00 <br />$40,000.00 <br />per drawing 106A and B case <br />I <br />3101 <br />4 <br />75 SF <br />Install valley gutter per drawing <br />$17.00 <br />$1,275.00 <br />$20.00 <br />$1,500.00 <br />$20.00 <br />$1,500.00 <br />$26.00 <br />I $1,950.00 <br />114 case 3101 <br />5 <br />3 Street <br />Provide Traffic Control plan and <br />$500.00 <br />$1,500.00 <br />$800.00 <br />$2,400.00 <br />$1,040.00 <br />$3,120.00 <br />$9,800.00 <br />$29,400.00 <br />implement traffic control per <br />section 7- 10.3.3 and 7- 10.3.4 <br />I <br />I <br />6 <br />15 EA <br />Provide Sleeve and Sign Pole <br />$100.00 <br />$1,500.00 <br />$150.00 <br />$2,250.00 <br />$312.00 <br />$4,680.00 <br />$290.00 <br />$4,350.00 <br />7 <br />60 EA <br />Street Name Signs <br />$120.00 <br />$7,200.00 <br />$95.00 <br />$5,700.00 <br />$368.00 <br />$22,080.00 <br />$375.00 <br />$22,500.00 <br />8 <br />2 EA <br />Bolt down truncated domes <br />$435.00 <br />$870.00 <br />$500.00 <br />$1,000.00 <br />$546.00 <br />$1,092.00 <br />$570.00 <br />$1,140.00 <br />9 <br />15 EA <br />Cast In place domes <br />$593.00 <br />$8,895.00 <br />$800.00 <br />$12,000.00 <br />$325.00 <br />$4,875.00 <br />$725.00 <br />$10,875.00 <br />10 <br />250 EA <br />Install Vertical Crub per drawing <br />$30.00 <br />$7,500.00 <br />$30.00 <br />$7,500.00 <br />$48.00 <br />$12,000.00 <br />$42.00 <br />`. $10,500.00 <br />100 case 3101 <br />11 <br />2 EA <br />Relocate Signal Poles to <br />$10,000.00 <br />$20,000.00 <br />$1,800.00 <br />$3,600.00 <br />$1,680.00 <br />$3,360.00 <br />$3,120.00 <br />$6,240.00 <br />accomdate ADA Ramp <br />12 <br />8 EA <br />Install 4' Pedestrian Push <br />$500.00 <br />$4,000.00 <br />$1,050.00 <br />$8,400.00 <br />$980.00 <br />$7,840.00 <br />$1,600.00 <br />$12,800.00 <br />Button Pole <br />13 <br />75 LF <br />Install Conduit and Cable <br />$5.00 <br />$375.00 <br />$130.00 <br />$9,750.00 <br />$126.00 <br />$9,450.00 <br />$32.00 <br />$2,400.00 <br />Bid Sumrnary,xlsx Page 1 of 4 Printed 8/15/2011 @ 3:57 PM <br />