Laserfiche WebLink
PROJECT TITLE: ADA Ramp Project 11 -12 <br />PROJECT NO.: 2010.014 <br />Pin nirn m 4i_-v3 nru <br />BID SUMMARY <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is nota finding that such <br />bid has been found to be responsive or accepted as corn plate by the City. An award <br />of contract, if any, is subject to approval of the City Council and /or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />AJW Construction <br />FBD Vanguard Construction, Inc. <br />Sposeto Engineering, Inc. <br />DATE: Monday, August 15, 2011 <br />Date Approved: 7/21/2011 <br />966 81 st Avenue <br />651 Enterprise Court <br />4558 Contractor, Place <br />TIME: 3:00 PM <br />Prepared by: NNC <br />Oakland, CA 94621 <br />Livermore, CA 94550 <br />Livermore, CA 94554 <br />LOCATION: City Clerk <br />Phone: 510- 568 -2300 <br />Phone: 925 - 245 -1300 <br />Phone: 925 - 443 -4200 <br />Fax: 510-639-1578 <br />Fax: 925 -245 -1007 <br />Fax: 925 -443 -5800 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />14 <br />1 LS <br />Install City Provided APS <br />$10,000.00 <br />$10,000.00 <br />$2,100.00 <br />$2,100.00 <br />$1,900.00 <br />$1,900.00 <br />$6,800.00 <br />$6,800.00 <br />System and Push Buttons <br />15 <br />1 EA <br />Relocate Pull box <br />$500.00 <br />$ 500.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />$520.00 <br />$520.00 <br />16 <br />100 SF <br />Stamped Colored Concrete <br />$20.00 <br />$2,000.00 <br />$20.00 <br />$2,000.00 <br />$30.00 <br />$3,000.00 <br />$21.00 <br />$2,100.00 <br />17 <br />1 LS <br />Striping <br />$1,000.00. <br />$1,000.00 <br />$3,000.00 <br />$3,000.00 <br />$5,460.00 <br />$5,460.00 <br />$5,500.00 <br />$5,500.00 <br />18 <br />35 LF <br />Modified Vertical Curb per Detail <br />$50.00 <br />$1,750.00 <br />$30.00 <br />$1,050.00 <br />$80.00 <br />$2,800.00 <br />$64.00 <br />$2,240.00 <br />11 Plan Sheet 4 <br />19 <br />4 EA <br />Furnish and Install Caltrans <br />$400.00 <br />$1,600.00 <br />$1,000.00 <br />$4,000.00 <br />$945.00 <br />$3,780.00 <br />$1,550.00 <br />$6,240.00 <br />Type ES -7P Pedestrian <br />Barricade <br />TOTAL BASE BID: $129,255.00 <br />$128,900.00 <br />$152,987.00 <br />$201,105.00 <br />I <br />SUBCONTRACTORS: <br />Mike Brown Electric, Lineation <br />Compass Engineering, Mike Brown <br />Compass Engineering, Mike <br />Marking <br />Electric <br />Brown Electric <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: <br />Reviewed by: _ Date: <br />Nico ro Castelino Project Manager <br />Reviewed by: Date: L b 2a 11 <br />do horn, Senior Engineer <br />Bid Summary.xlsx Page 2 of 4 Printed 811 512 01 1 @ 3:57 PM <br />