My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2011-193
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2011
>
Reso 2011-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:23:19 PM
Creation date
11/30/2011 12:05:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/21/2011
Retention
PERM
Document Relationships
3B Public Hearing 2011 1121
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Electrical transformers shall be vaulted underground. In the event that the <br />transformer cannot be undergrounded, it shall be screened from view consistent <br />__.wiih- -the- access- requireriteiits -of FG&E. Details -for-- screening -shall be subject to <br />the review and approval of the Community Development Director. <br />D. All walls, fences, and landscaping within 25 feet of any street intersection or <br />driveway shall be maintained at a height of not more than 36 inches above the top <br />of the nearest adjacent curb and gutter to allow for adequate sight distance, or <br />unless otherwise approved by the City's Transportation Engineer. <br />VIII. MAINTENANCE <br />A. The project site shall be well maintained and shall be kept free of litter, debris and <br />weeds at all times; during construction, the site shall be well maintained and shall be <br />kept free of litter, debris and weeds. <br />B. Any graffiti shall be promptly removed from building walls, perimeter soundwalls <br />and /or fences. The developer and its successors in interest shall comply with the <br />rules and regulations of the City's graffiti removal program and shall grant a <br />license and right of entry as requested to enforce the terms of such program. <br />C. All landscaping improvements shall be maintained in a healthy, growing condition <br />at all times. <br />D. During the construction phase, the site shall be enclosed with a security fence and <br />shall be well maintained in a neat manner, free of weeds, litter and debris. <br />IX. CONSTRUCTION PROVISIONS <br />A. Construction on the project site shall not commence prior to 7:00 a.m. and shall <br />cease by 7:00 p.m., Monday through Friday, and shall not commence prior to 8 <br />a.m. and shall cease by 7 p.m. Saturday and Sunday, unless otherwise approved by <br />the Chief Building Official. There shall be no construction on Federal holidays. <br />Interior construction such as sheet rock taping and texturing, painting, tile <br />installation and similar activity shall be permitted outside the above hours <br />provided that construction noise shall not be detectable outside of the buildings <br />under construction or renovation. <br />B. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Washington <br />Avenue from the project site during construction. Standard construction dust <br />control procedures, such as wetting, daily roadwashing and other maintenance <br />functions to control emissions, shall be implemented at all times during outdoor <br />construction. Dust generating activities such as grading, excavation, paving etc., <br />Recommended Conditions of Approval November 21, 2011 <br />PLN2009- 00006; 2450. Washington Apartments Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.