My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2011-193
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2011
>
Reso 2011-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:23:19 PM
Creation date
11/30/2011 12:05:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/21/2011
Retention
PERM
Document Relationships
3B Public Hearing 2011 1121
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be scheduled the early morning and other hours when wind speeds are low. <br />All construction activities entailing soil disturbance shall cease when winds <br />exceed 30 miles per hour as an hourly average. <br />C. The developer shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City <br />Transportation Administrator prior to receipt of the grading permit. <br />D. Truck hauling activities shall be restricted to 5:00 a.m. to 5:00 p.m. There shall be <br />no truck hauling activity on Saturdays, Sundays and Federal holidays. <br />E. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br />F. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle /control noise from available equipment. <br />G. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) Streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) Paving and planting shall be done as soon as possible. <br />City shall charge developer, and developer shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br />H. The property shall be secured during construction with a six (6) foot tall chain link <br />fence and any other security measures in accordance with recommendation of the <br />San Leandro Police Department. <br />X. POLICE DEPARTMENT REQUIREMENTS <br />A. All trees planted to be mature enough and located are enough away from the <br />sidewalk so their branches are at least 5 feet above the sidewalk area and 14 feet <br />above the roadway. <br />B. All building addresses shall be placed in such a position as to be plainly visible <br />and legible from the street. Said numbers shall contrast with their background and <br />be visible at night. Details including number size and location shall be submitted <br />for the review and approval of the City of San Leandro Police Department, Fire <br />Marshal and the Community Development Director, prior to issuance of building <br />permits. Street names shall be approved by the City of San Leandro Police <br />Department, Fire Marshal and the Community Development Director. Specific <br />property addresses will be assigned by the Building Division of the Community <br />Development Department. <br />Recommended Conditions of Approval November 21, 2011 <br />PLN2009- 00006; 2450 Washington Apartments Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.