Laserfiche WebLink
Infrastructure Mitigation Strategies <br />7 of I I <br />E _ -. M z z Re Agency <br />Ordinance or Resolution # (if existing <br />a <br />o a or Department <br />program), Estimated Cost and <br />° <br />m n m ,3 a m .� (Requ if Exisling <br />� <br />Possible Funding Agency [f high <br />Specific Mitigation Strategy <br />vI m` a -o b ¢ ,p m @ Program. Existing <br />i5 -6 <br />prlorlly). Esilmated Dale or <br />ol m <br />Z _ Q- m Program under <br />_Q `m Y H <br />Core pletion (d study), WHY if not <br />N Zy �., o a ,� s G � funded, Very High, <br />same as regional priority, OR Other <br />a] <br />4 2 W W e 7 7 m ° _ �° ri Z¢ ❑ U z U High, or Under Study) <br />Comments <br />d-3 <br />Conduct a watershed ana"s at least once every <br />FL <br />XX <br />Alameda County <br />ten years unless there is a major development in <br />Flood Control <br />the watershed or a m aior change in the Land L1 se <br />District. <br />Element of the General Plan of the cities or <br />counties within the watershed. <br />FL <br />d-4 <br />Assist, support, andior encourage the U.S. Amry <br />City Manager and <br />Standard procedure <br />Corp of Engineers, various Flood Control and <br />Engineering & <br />Water Conservation Districts, and other responsible <br />Transportation <br />agencies to locate and maintain funding for the <br />development of good control projects that h eve high <br />cast- bensfit ratios (such as through the writing of <br />letters of support andior passing resolutions in <br />. support of these efforts). <br />FL XX <br />d-5 <br />Pursue funding for the design and construction of <br />Engineering and <br />Vail be considered for future <br />storm drainage projects to protect vulnerable <br />Transportation for <br />planning. <br />properties, including property acquisitions, <br />City -owned facilities, <br />upstream storage such as detention basins, and <br />mostly smaller <br />ch an n el wi de n in g with the associated right -of-way <br />diameter pipelines. <br />acquisitions, relocations, and environmental <br />Alameda County <br />mitigations. <br />Flood Control <br />District for large <br />diameter pipelines, <br />channels, and <br />regional Flood <br />control prevention- <br />1 <br />Continue to repair and make structural <br />FL <br />XX <br />Engineering & <br />Standard procedure as financial <br />improvements to storm drains, pipelines, andior <br />- <br />Transportation <br />resources are available. <br />chan nels to enable sham to perform to their design <br />capacity in handling water Flows as part of regular <br />maintenance activities. (This strategy hasthe <br />secondary ben efit of addressing fuel, chemical, and <br />cleaning product issues.) <br />FL <br />XX <br />Public Works <br />Stone drain system is cleared <br />d-7 <br />Continue maintenance efforts to keep storm drains <br />and creeks free of obstructions, while retaining <br />annually <br />vegetation in the channel (as appropriate) to allow <br />for the free flow of water. <br />FL <br />XX <br />Standard procedure <br />d-8 <br />Enforce provisions under creek protection, <br />Public Works <br />stormwater management, and discharge control <br />ordnances designed to keep watercourses free of <br />obstructions and to protect drainage facilities to <br />conform with the Regional Water Quality Control <br />Board's Best Management Practices. <br />7 of I I <br />