Laserfiche WebLink
Infrastructure Mitigation Strategies <br />4 oft1 <br />Zz <br />Responsible Agency <br />i Ordinance or Resolution # of existing <br />s <br />v <br />v_ `o <br />or Department <br />prdrgramt Estimated Cost and <br />�' <br />0 � ° <br />(Required if Existing <br />Possible Funding Agency (if high <br />Specific Mitigation Strategy <br />yr <br />a w < E ,2 m u m <br />` _g <br />Program, Existing <br />priority), Estimated late of <br />de 2 <br />rrr <br />.IM <br />yr , x <br />Program under <br />Completion (if study). WHY if not <br />\ \\ <br />>. o ri .� a o y; <br />funded. Very High, <br />same as. regional priority, OR Other <br />€iT <br />W <br />Lu 3 � m , v 2 € . D Z 4 i3 <br />{} Hgh, or Cinder Study); <br />Comments <br />a -20 <br />Establish plans for delivery offuel to critical <br />EQ °)(X <br />! <br />;F €Hance <br />;Mrkingwith con sorburn of cities <br />infrastructure provides. <br />L <br />_ <br />to establish rue] cooperative- <br />E <br />FL <br />SEC <br />a -21 <br />As an infrastructure operator. designate a hack -up <br />EQ XX <br />iGity, hAanager <br />,Police building has bean <br />Emergency Operations Censer with recharrdart3 <br />LS <br />_ _ <br />!designated the back -up ECC <br />communications systems. <br />4ifF <br />FL <br />SEC <br />a -22 <br />Monitor scientific studies ofthe Sacramento -San <br />EQ <br />Public Works and <br />Will be considered for future <br />Joaquin Delta and policy decWons related to the <br />FL <br />_ <br />;Engineering & <br />planning. <br />long -term disaster resistance of that Delta system <br />;Transportation <br />to ensure that decisions are made based on <br />comprehensive analysis and in a scientifically- <br />defensible manner. Levee failure die to <br />earthquakes., flooding, and dimate change <br />(including sea level rise and more frequent and <br />mare severe flooding) are all of concern. The long- <br />term health ofthe Delta area is critical to the Bay <br />Area's water supply, is essential for the San <br />Francisco Bay and estuary's environmental health, <br />provides recreation opportunities for lay Area <br />residents; and provides the long-term sustainability <br />of Delta communities. While only part ofthe Delta is <br />within the nine Bay Area counties covered by this <br />multi - jurisdictional LH 9 P, the Delta is tied to the <br />infrastructure, water supply, and economy ofthe <br />Bay Area. <br />EQ lXX <br />s <br />Engineering & <br />Replacement underway for two <br />IN FR - <br />t;- Earthquakes <br />b t <br />Expedite the funding and retrofit of seismically- <br />deficient city- and county-owned bridges and road <br />_ <br />(Transportation <br />.major overcrossings <br />structures by working with Caltrans and other <br />app rop riategovernmental agencies. <br />b-2 <br />Establish a higher priority for funding seismic retrofit <br />_ <br />EQ <br />Transit <br />of existing transportation and infrastructure systems <br />(such as BART) than for expansion ofthose <br />,systems- <br />b-3 <br />]nc €ode `areas subject to high ground shaking. <br />EQ XX <br />(Engineering and <br />(Standard procedure <br />earthquake - induced d- Bound .. failure; and surface <br />_ <br />!Transportation <br />fault rupture` in the list ofcriteria used for <br />determining a replacement schedule for pipelines <br />(along with importance, age, type of construction <br />material, size. condition, and maintenance or repair <br />history). <br />4 oft1 <br />