Laserfiche WebLink
ACTIA 2002 -26 <br /> EXHIBIT "B" <br /> PROJECT SCHEDULE <br /> ACTIA PROJECT No. 17 - HESPERIAN BOULEVARD /LEWELLING AVENUE WIDENING <br /> Task Start Finish 99/00 00/01 01/02 [ 02/03 03/04 04/05 05/06 06/07 <br /> Preliminary Engineering 1/02 6/02 <br /> Environmental Studies 1/02 6/02 <br /> Final Design PS&E 7/02 9/03 <br /> Right of Way - Support 3/02 3/03 <br /> Right of Way - Capital 7/02 3/03 <br /> Utility Relocation /Protection 10/03 3/04 <br /> Construction Contracts 10/03 9 /04 iii4 _ _ <br /> Construction Engineering 10/03 9/04 <br /> Equipment Purchase N/A <br /> ACTIA PROJECT No. 18 - WESTGATE EXTENSION <br /> Task Start Finish 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 <br /> Preliminary Engineering (PSR) N/A <br /> Environmental Studies N/A <br /> Final Design PS&E 4/02 3/04 <br /> Right of Way - Support 4/02 9/03 <br /> Right of Way - Capital 7/02 9/03 <br /> Utility Relocation 4/04 3/05 <br /> Construction Contracts 4/04 9/05 <br /> Construction Engineering 4/04 9/05 <br /> Equipment Purchase N/A <br /> ACTIA PROJECT No. 19 - E. l4T" STREETIHESPERIAN BOULEVARD /150 AVENUE <br /> Task Start Finish 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 <br /> Preliminary Engineering (PSR) 7/02 12/02 <br /> Environmental Studies 7/02 12/02 <br /> Final Design PS&E 1/03 3/04 <br /> Right of Way - Support 1/03 9/03 <br /> Right of Way - Capital 1/03 9/03 <br /> Utility on 4/04 <br /> Construction ruruction tion Contracts 4/04 12102/0 <br /> 4 <br /> Construction Engineering 4/04 12/04 <br /> Equipment Purchase NIA <br /> Note: List, advertise and award tlmeframes for construction are Included in the Final Design schedule. <br /> Final 5/16/02 Page B-1 <br />