My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 0520
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0520
>
8F Consent 2013 0520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:52:37 AM
Creation date
5/15/2013 2:09:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0520 RGAmended2
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
Reso 2013-061
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
Supplement 8F Consent 2013 0520
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
C ITY OF S AN L EANDRO <br />S AN L EANDRO S HORELINE D EVELOPMENT P ROJECT EIR <br />EXHIBIT A: WORK SCOPE AND COSTS <br /> <br />THE PLANNING CENTER | DC&E 21 <br />MAY 1, 2013 <br /> <br />Utility review and impact analyses will include, but not necessarily be limited to the following: <br />♦ City of San Leandro for sanitary sewers and lift stations at Marina Boulevard and at the <br />old Blue Dolphin site. <br />♦ East Bay Dischargers Authority (EBDA) for the sewer collector and outfall lines along the <br />San Leandro Shoreline from the City’s Water Pollution Control Plant to the EBDA <br />Dechlorination Facility near the Estudillo Canal. <br />♦ City of San Leandro and Alameda County Flood Control and Water Conservation District <br />for storm drains including the 60-inch storm outfall at the west end of Fairway Drive. <br />♦ Alameda County Industries for solid waste. <br />♦ East Bay Municipal Utility District for domestic and fire suppression water services. <br />(TranSystems will assist the City in preparing a request for a Water Supply Assessment <br />from EBMUD). <br />♦ City of San Leandro, East Bay Municipal Utility District and East Bay Dischargers <br />Authority for potential reclaimed water supply/uses. <br />♦ City of San Leandro for existing and future use of the golf course well and reservoir <br />system. <br />♦ Pacific Gas and Electric Company for gas and electric services. <br />♦ AT&T and Comcast for telecommunications and cable television services. <br /> <br /> <br />Task D. Alternatives Evaluation <br />The Planning Center | DC&E will complete an impact analysis for the CEQA-required No <br />Project Alternative, and two other alternatives. The alternatives analysis will include a <br />quantitative analysis for vehicle trips, operating emissions, greenhouse gas emissions, and <br />population. For all other topics analyzed, the analysis will be a qualitative discussion that will <br />identify the environmentally superior alternative. <br /> <br /> <br />Task E. Administrative Draft EIRs <br />The Planning Center | DC&E will prepare first and second Administrative Draft EIRs (ADEIRs) <br />and submit to City staff for review and comment. The impact analysis will be comprehensive
The URL can be used to link to this page
Your browser does not support the video tag.