My WebLink
|
Help
|
About
|
Sign Out
Home
Supplement 8F Consent 2013 0520
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0520
>
Supplement 8F Consent 2013 0520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2013 3:12:12 PM
Creation date
5/29/2013 3:11:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
8F Consent 2013 0520
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
C ITY OF S AN L EANDRO <br />S AN L EANDRO S HORELINE D EVELOPMENT P ROJECT EIR <br />EXHIBIT A: WORK SCOPE AND COSTS <br /> <br />THE PLANNING CENTER | DC&E 5 <br />MAY 1, 2013 <br /> <br />31. Davis Street (SR-112) & I-880 Northbound ramps <br />(1) 20, 21, and 25 are future signalized intersections intersection <br />(2) 5, 26, 27, 28, 29, and 30 are existing non-signalized intersections <br /> <br />The scope of work and cost estimate assume that 31 intersections will be analyzed. The final <br />list of analysis intersections will be prepared using a screening analysis and input from the <br />City. Based on the preliminary Project trip generation and distribution, KAI will conduct a <br />screening analysis. All intersections in the Project vicinity that would be affected by at least <br />50 new peak hour trips will be considered for more detailed analysis. If the final list of <br />analysis intersections exceeds 31, a budget adjustment may be required. <br /> <br />1. PROJECT INITIATION <br />KAI will review available documents and data from City and attend a kick-off meeting with <br />City staff to refine the proposed scope of work. As part of this task, KAI will also determine <br />and refine the specific tasks to be completed as part of the site planning effort versus the EIR <br />effort. Based on the preliminary traffic assignments and in consultation with City staff, KAI <br />will select any the additional study intersections for analysis. <br /> <br />2. DATA C OLLECTION <br />1. The City has already compiled existing counts for 23 intersections. Therefore KAI will <br />conduct counts for the remaining study locations, as follows: <br />28. Monarch Bay Drive & Mulford Point Drive <br />29. Monarch Bay Drive & Pescador Point Drive <br />30. Monarch Bay Drive & Fairway Drive <br /> <br />The following intersections were not counted by City due to active construction at the Kaiser <br />Medical site. These locations will not be counted by KAI as they represent new intersections <br />and to the extent possible will instead rely on historical counts or traffic model forecasts: <br />13. Republic Avenue & Merced Street <br />16. Fairway Drive & Miller Street <br />24. Fairway Drive & Kaiser West Driveway <br />25. Marina Boulevard & Kaiser North-South Access Road <br />
The URL can be used to link to this page
Your browser does not support the video tag.