Laserfiche WebLink
C ITY OF S AN L EANDRO <br />S AN L EANDRO S HORELINE D EVELOPMENT P ROJECT EIR <br />EXHIBIT A: WORK SCOPE AND COSTS <br /> <br />THE PLANNING CENTER | DC&E 17 <br />MAY 1, 2013 <br /> <br />♦ Archival research, including a record search of the files at the Northwest Information <br />Center, Sonoma State University and the library and files of Tom Origer & Associates. <br />♦ Contact with the Native American Heritage Commission and local Native American <br />persons and/or organizations in writing. <br />♦ Field survey of the approximately fifty-two (52) acre proposed development area of the <br />project site. <br />♦ Preparation of a written report that will include the results of the Native American <br />contact, archival research, and field survey of the project location. Formal evaluation of <br />any cultural resources is beyond this scope of work. <br /> <br />The Planning Center | DC&E will summarize the findings from the studies prepared by Tom <br />Origer & Associates. Tom Origer & Associates will recommend mitigation measures as <br />required to mitigate project level and cumulative impacts. <br /> <br />5. GEOLOGY AND SOILS <br />To assess geologic hazards and geotechnical impacts (referred to herein as geotechnical <br />impacts) for this site, AKA will review historic aerial photographs in order to aid in evaluation <br />of the site development history, perform a site reconnaissance, review published geologic <br />maps and data reports, and review and compile subsurface data from geotechnical reports <br />from the study area that may be on file at the City of San Leandro building department. <br /> <br />Based on the above information, AKA will provide a generalized characterization of the <br />geologic and geotechnical site conditions, present a summary of the compiled subsurface <br />data, and provide a planning level analysis of the geotechnical impacts of the project and <br />alternatives, in conformance with the CEQA Guidelines. <br /> <br />6. HAZARDS AND HAZARDOUS M ATERIALS <br />The Planning Center | DC&E will conduct a review of potential hazards and hazardous <br />materials impacts on the project site. Recognized environmental concerns, including the <br />underground fuel storage tank on the project site will be evaluated and addressed in this <br />section. The Planning Center | DC&E will also describe construction and development <br />activities, as well as the presence/absence and significance of hazardous waste risks. The <br />Planning Center | DC&E will recommend mitigation measures, as required. <br />