My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2013 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2013
>
Agmt 2013 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:06:35 AM
Creation date
5/30/2013 11:06:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
Reso 2013-061
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY OF SAN LEANDRO <br /> SAN LEANDRO SHORELINE DEVELOPMENT PROJECT EIR <br /> EXHIBIT A: WORK SCOPE AND COSTS <br /> study that relied on a factoring process based on the ratio of Saturday versus the weekday <br /> peak hour periods. <br /> 5. TRAVEL FORECASTS <br /> Through City of San Leandro, KAI will use the current Alameda Countywide Travel Demand <br /> Model dated August 2012 with Projections 2009 land use update. KAI will also use the <br /> Alameda Countywide Travel Demand Model's daily and AM and PM peak hour volume <br /> forecasts as the basis for the 2020 and 2035 analysis. In addition, KAI will review other <br /> recently completed traffic studies in the area. In consultation with City staff,the forecasts will <br /> be revised to reflect recent approved or pending projects and roadway improvements that <br /> were not included in the General Plan analysis and the Alameda Countywide Travel Demand <br /> Model. The resulting volume forecasts will be compared to the existing intersection volumes <br /> to develop annual growth rates. These growth rates will be used to develop 2020 No Project <br /> and Saturday peak hour volumes. <br /> Project traffic will be added to the No Project scenario to estimate the "2020 with Project <br /> scenario. Vehicle trips generated by the retail and non-retail components of the project will <br /> be tracked separately and their contribution at each location will be documented. Travel <br /> forecasts will be prepared for AM,PM,and Saturday conditions for the following scenarios: <br /> 1) Existing(2013)without Project <br /> 2) Existing(2013)with Phases 1,2 and 3 <br /> 3) 2020 without Project <br /> 4) 2020 with Project Phases 1,2 and 3 <br /> 5) 2035 without Project <br /> 6) 2035 with Project Phases 1,2 and 3 <br /> 6. TRAFFIC OPERATIONS ANALYSIS <br /> The impact of the proposed Project on traffic operations will be analyzed at the study <br /> locations using the 2010 HCM methods (Note: Using the 2010 Highway Capacity Manual <br /> (HCM)can be a supplemental option)for the weekday AM and PM and Saturday peak hours <br /> for the following scenarios (Saturday analysis will only be conducted at the (10) key <br /> intersections identified above for the following scenarios: <br /> 1. Existing(2013)without Project <br /> 2. Existing(2013)with Phases 1,2 and 3 <br /> 3. 2020 without Project <br /> THE PLANNING CENTER I DC&E 7 <br /> MAY 1,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.