My WebLink
|
Help
|
About
|
Sign Out
Home
10C Action 2014 0303
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0303
>
10C Action 2014 0303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:07:13 AM
Creation date
3/5/2014 4:46:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/3/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0303 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0303
Reso 2014-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
• Updated summary of existing urban design and aesthetic conditions in San <br />Leandro. <br />• Summary of the City's design review program. <br />• Narrative description of existing utilities and services. <br />♦ Task 5: Plan Policy and Land Use Map Update <br />• New General Plan policies and actions. <br />• Updated Land Use Map. <br />♦ Task 6: Preparation of Draft General Plan <br />• Updated General Plan Elements: <br />— Administrative Draft <br />— Screencheck Draft <br />— Public Review Draft <br />♦ Task 7: Preparation of 2015-2022 Housing Element <br />• Summary of review of the current (2007-2014) Housing Element. <br />• Needs Assessment. <br />• Inventory of Adequate Sites (maps prepared by City staff). <br />• Goals, policies, and quantified objectives. <br />• Action Program. <br />• Administrative Draft for Staff and HCD review. <br />• Official "response to HCD comments" document. <br />• Public Review Draft Housing Element. <br />♦ Task 8: Preparation of Draft Environmental Impact Report <br />• Notice of Preparation. <br />• Project Description. <br />• Buildout calculations. <br />• Significance criteria. <br />• Administrative Draft FIR. <br />• Screencheck Draft EIR. <br />• Public Review Draft EIR. <br />• Notice of Completion. <br />• Administrative Draft. Final EIR. <br />• Screencheck Draft. Final FIR. <br />• Public Review Draft. Final FIR. <br />♦ Task 9: Plan Adoption <br />0 Final General Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.